Warranty
7
9008SJ
ASSEMBLY INSTRUCTIONS
STEP 5:
Once the initial 8 springs have been 
attached to their corresponding V-rings 
and openings on the Top Rail, attach the 
remainder of the springs (Part 14) in 
clockwise orderfrom current springs. 
NOTE: 
If you see that the Jumping Mat looks 
uneven, make sure to locate the proper 
V-Rings on the Mat to the correct Spring to 
avoid excessive pressure on the Mat.
STEP 4:
Using the T-Hook Spring Tool (Part 16), 
attach eight initial springs (Part 14) directly 
across from each other at “compass 
points” as shown.
NOTE: 
Only use the T-Hook Spring Tool included 
with this product to attach the springs. 
NEVER use your hands only or other 
household tools to attach these springs.
We suggest that you count the V-rings on 
the mat as they line up to the holes in the 
top rail before continuing.
5
4
1
2
3
4
5
6
7 8










