Instructions / Assembly

ASSEMBLE SIDE
SKIRT AND
HANDLES
PARTS NEEDED:
Side Skirt Foam Padding (1)
Hand Rail Bases (2)
Center Handle (1)
STEP 3
5. Attach the Handrail Bases to the Trampoline by rst removing the plastic Leg Cap from the Legs they are to be placed on. Next,
slide the Handrail Bases up onto the unit, and secure by replacing the Leg Cap. Join the Handrail Bases together by snapping the
Center Handle piece into place. Lastly, the the strings at the ends of the padding and side cover around the leg using the fabric
loops sewn into the padding. NOTE: If you are unable to attach the center handle piece, switch the sides the Handrail Bases are attached to.
4. Fold the Side Skirt (sewn to the top cover) down so it covers the frame of the
trampoline. Begin to tuck the white side skirt padding on the inside of the Side Skirt fabric
between it and the trampoline legs. Carefully tuck the top of the padding up into the sewn
seam of the top skirt fabric and the top padding. Do not tie the Skirt ends yet. Leaving these
ties free, tie the inner strings on the padding to the strings on the inside of the cover skirt fabric.
Finally, attach the foam loops sewn into the bottom of the Side Skirt to the legs of the
trampoline.
1 866 498 5269
Customer Service
customerservice@puregbi.com
MODEL NO. 9020CT
INSTRUCTIONAL “HOW-TO” QUICK
VIDEOS ALSO AVAILABLE ON LINE AT:
pureglobalbrands.com