Technical data

General procedure:
To implement a simple task (transferring data from PLC 1 to PLC 2 via
pre-configured links with HDBs) the following procedure is required:
The links between the PLCs must be configured (as mentioned in the
general guidelines). For planning the link, refer to Characteristics of the
S5-S5 Link (Section 7.2.1).
Assigning parameters to the individual CP modules. This involves
creating the SYSID and INIT blocks (refer to Chapter 6).
Configuring the links between the PLCs. This involves creating the link
blocks (refer to Section 7.1) according to the planned task.
Programming the CPUs of the PLCs according to the task. This
involves HDBs, OBs, FBs and DBs.
7.2.1 Configuring S5-S5 Links
With the link editor of the COM 5430 TF/COM 5431 FMS software package
you assign parameters for the links between two stations on the bus. You
can also generate default S5-S5 links valid throughout the network (refer to
Section 6.5.4.4).
SEND / ANR 2
RECEIVE / ANR 101
STATION 1 STATION 1
SAP 2 SAP3
L2 link
Fig. 7.8 Schematic Representation of a Link Between 2 Stations
B8976060/02 S5-S5 Communication
7 - 11 Volume 1