The entire bottom surface of the tub base must be supported. To accomplish this, a bed of mortar or low shrinkage 
plaster can be applied under the tub base at the time of final setting. The amount of material used should be 
sufficient only to level the bath unit and not to raise it. Level the bath unit along the top edge of the rim when 
the setting bed is applied. Allow the setting material to set completely before applying weight to the bath. This 
procedure is essential to ensure the bath unit has proper support and drainage. The rim of the bath unit is not 
designed to support weight. If finish material is to overlap or contact the bath unit, the added weight of the 
material must be fully self-supporting.
To obtain detailed dimensional, floor loading, capacity, and required system component clearance information 
foryourparticularmodel,pleasecontactPurewaterBathstoll-freeat877-733-8022.
SERVICE ACCESS
The system does not require an external access panel for service. Access 
to the jet motors, the control electronics and the electrical service 
connections is accomplished from inside the tub. The command pad, 
located on the side of the tub, provides an internal panel through which 
the control electronics and electrical service connection can be accessed 
for service. An unobstructed clearance area of 2 inches is required to the 
left, right, bottom and rear of the box indicated at right in order to allow 
service access. This area must not contain any ledger boards, supports or 
vertical studs.
FRAMING AND SUPPORT
The drain extends below the bottom of the bath and requires a cutout in the floor. The floor structure beneath 
the bath must be able to support the total weight of the bath, water, and bather. The Minimum Floor Structural 
Requirement recommended is 100 pounds per square foot.