Installation Guide
 4
Installation
GENERAL CONSIDERATIONS FOR ALL 
DISINFECTION UNITS:
1.  When installing the equipment, it is necessary that the 
unit be isolated from vibration, heavy equipment, and 
poorly connected piping.
2.  Incoming water temperature to the unit should not 
exceed 35° minimum to 110° maximum degrees Fahrenheit.
3.  The operating pressure should not exceed 100 psi.
4.  Before putting the unit into final operation follow 
sanitation procedures as outlined in this manual for proper 
disinfection. Sanitizing all discharge piping and fittings 
with household  bleach from disinfection unit to point  
of   use removes existing contaminants and gives the unit a 
“clean start.” Be sure to rinse with U.V. treated water.
5.  A flow control, included with the unit, must be 
installed to insure only the designated flow through the 
unit for proper disinfection. 
GENERAL PRECAUTIONS TO BE FOLLOWED 
AT ALL TIMES:
Only qualified persons or licensed professionals should be 
involved in the installation or service maintenance of  this 
system. Contact PurTest with any questions prior to 
working on this system.
1.  Always disconnect electrical power to any U.V. unit 
before servicing. 
2.  Under no circumstances should personnel look at a 
U.V. lamp in operation (EXCEPT through an external 
sight Port lens located on the outside of  the unit).
3.  U.V. disinfection units must always be properly 
grounded. The PT series are always placed after the 
pressure tank and any other type of  treatment devices (i.e. 
softeners, filters).
These units are normally installed in a vertical position in 
an enclosed area with good ventilation. Allow clearance of  
at least the unit’s length at one end for quartz sleeve and 
lamp replacement. Two (2) anchor bolt holes are provided 
for proper wall support. Use wall plugs with screws for 
sufficient support (not included). A lock nut secures the 
mounting bracket to the U.V. chamber.
If  your piping system is subject to impulse pressure 
resulting in a “water hammer” condition, a surge tank or 
other means must be provided to remove this condition; 
otherwise, this extreme shock pressure condition may 
rupture or fracture the quartz sleeve.
Make all plumbing connections to allow for ease of  
service. Be sure to follow all local plumbing codes and 
U.V. restriction requirements where specified by local 
authorities.
UV CHAMBER & CONTROL BOX MOUNTING
The UV Chamber and Control Box design allows for 
several mounting configurations. The Control Box comes 
standard mounted to the UV Chamber as shown in Option 
A Installation Diagram on Page 5.
The Control Box may be removed and mounted on the 
wall, with optional second mounting bracket, right next to 
the UV Chamber as shown in Option B or C on the 
installation diagram. (Wall mount screws are not included).
STEP BY STEP INSTALLATION:
1. Turn off  the water before cutting into the water line.
2. Assess the installation (i.e. type of pipe, size of  lines, 
etc.) and obtain necessary plumbing fittings for installation.  
Inlets and outlets on PT units are 3/4” FNPT and 1” 
MNPT. Use Teflon tape on all threaded connections and 
avoid over tightening.
Note: The flow control is a press in type. All UV 
chambers come standard with a 3/4" FMPT connection 
and a 1" MNPT connection on the Inlet / Outlet nipple.  
Make sure the rubber part of  the flow control is facing 
outward from the bottom inlet. Simply hand press or 
slightly tap in the flow control until it sits on the inside 
ledge of  the machined bottom inlet. (see Installation 
Diagram on page 5)
3. Using the mounting bracket provided, secure unit to 
wall, or other surface. Make sure to allow enough room 
to install, replace, and clean the quartz sleeve and lamp.  
Installing a water shut-off valve before and after the unit 
is recommended to make servicing easy.
4. After mounting, install quartz sleeve, and O-Ring, per 
Quartz Sleeve instructions on. Turn on the water slowly, 
check for leaks, and repair as needed prior to full service 
operation.
QUARTZ SLEEVE:
Installation of  the Quartz Sleeve:
Always handle quartz sleeves carefully to prevent breaking 
or chipping. The quartz sleeves are to be clean and free of  
fingerprints before installing. 
After unplugging the unit, remove the brass dust cap and 
electrical connection. Then remove brass end nut. Install 
the quartz sleeve through the stainless steel threaded nipple 
until it is centered in the Quartz spring. Use a small amount 
lubricant and install the O-Ring around the Quartz Sleeves 
until it touches the S.S. nipple on the UV Chamber. Avoid 
riding the O-Ring on any threaded part of  the nipple.  
Hand-tighten the brass end-nut to form a compression seal 
around the quartz sleeve. Tightening the end nut will lower 
the quartz sleeve into the spring assembly compressing the 
O-Ring and providing a water tight seal. When installed 
properly there is a small amount of  space left between the 
top of  the quartz sleeve and the inside top of  end nut. 
Avoid overtightening the nut, which may cause a fracture 
on the end of  the quartz sleeve. Under normal operation 
conditions, hand-tightening will provide a 100 psi seal. Do 
not use any devices to tighten end nut.
After you have tightened the brass end nut and all other 
plumbing connections, open the outlet valve. Slowly open 
the inlet valve and flush out all remaining air. Then close 










