Technical information
PV Grid-tied Residential Inverter and Integrated AC/DC Disconnect
Installation and Operation Manual
23
!
WARNING
Ensure the main circuit breaker at the utility service panel is
switched off before connecting to the AC terminal block.
!
AVERTISSEMENT
S’assurer que le disjoncteur principal du panneau de service
public est déconnecté avant de le connecter au bloc de jonction
en CA.
To wire the inverter/disconnect unit to the main utility grid, follow these
steps.
1. Ensure the disconnect switch is in the OFF position.
2. Route conduit from the main breaker panel to the AC side of the
disconnect.
3. Insert a tting into one of the AC knockouts on the bottom of the
disconnect and fasten securely with a locking nut. Refer to Figure 4-2
for knockout locations.
4. Route the AC conductor from the main utility service panel to the AC/
DC Disconnect using an NEC compliant method.
5. Route the conductors through the tting and into the wire raceway
in the disconnect. Refer to Table 4-5 to determine the appropriate
conductors.
6. Connect the ground conductor to the terminal marked with the ground
symbol located on the left side of the AC circuit board inside the
disconnect.
Note: Wheninsertingconductors,ensurethattherearen’t
anyloosestrandsontheconductorwhensecuredtothe
terminalblock.Anyloosestrandscaneffectivelyreduce
thecurrentcarryingcapacityofagivenconductor.
Additionally,thereisriskcreatingashortacross
conductorsthroughloosestrands.
7. Connect the L2 conductor to the terminal marked “L2” on the AC
circuit board inside the disconnect .
8. Connect the L1 conductor to the terminal marked “L1” on the AC
circuit board inside the disconnect.
9. Ensure all connections are wired correctly, properly torqued and there
are no loose strands of wire.