Specifications
87 
Figure 73 - Tentative Schedule 
Permission Pending 
8.2 Budget 
At  the  beginning  of  the  project,  it  was  believed  that  our  budget  would  be  just  under 
$2000, however, it turns out that the wind turbine and solar cells would not be made 
available  for  our  use.  Fortunately,  it‟s  looking  like  some  of  our  other  initial  estimates 
were a little high, so we may still be reasonably close to the original budget when all is 
said  and  done.  The  figure  below  shows  the  newly  adjusted  budget  reflecting  the 
addition  of  a  wind  turbine  and  solar  cells.  Prices  that  have  dropped  since  the  initial 
proposal  are  the  Optima  Battery,  steel  base,  aluminum  framing,  and  AC  –  DC 
conversion parts. These changes overall result in a net budget increase of $950. 
Budget 
Part 
Price 
Solar Cells 
$500.00 
Wind Turbine 
$900.00 
Optima Battery 
$150.00 
LCD Screen 
$30.00 
MSP430 
$10.00 
1-Sep 15-Sep 1-Oct 15-Oct 1-Nov 15-Nov 1-Dec 15-Dec 1-Jan 15-Jan 1-Feb 15-Feb 1-Mar 15-Mar 1-Apr 15-Apr
Batteries
Maximum Power Point Tracking
Charging Circuitries
Power Inverters
Wind Turbines
PV Cells
Power Usage/Generation Calculations
Battery Charge State Calculations
Displays
Microcontrollers
Batteries
Maximum Power Point Tracking
Charging Circuitries
Power Inverters
Wind Turbines
PV Cells
Power Usage/Generation Calculations
Battery Charge State Calculations
Displays
Microcontrollers
Batteries
Maximum Power Point Tracking
Charging Circuitries
Power Inverters
Wind Turbines
PV Cells
Power Usage/Generation Calculations
Battery Charge State Calculations
Displays
Microcontrollers
Batteries
Maximum Power Point Tracking
Charging Circuitries
Power Inverters
Wind Turbines
PV Cells
Power Usage/Generation Calculations
Battery Charge State Calculations
Displays
Microcontrollers
Research
Design
Assembly
Testing