Specifications
HH
AA
BB
CC
VV
11.2.4 Typical horizontal installation11.2.4 Typical horizontal installation
Vertical installationVertical installation
Use a hexagonal bolt with 2 washers(M4 8mm)
Fix left and right installation trays onto host instrument.
VV
CC
BB
AA
HH
-19-
Hexagonal bolt with 2
washers(M4 8mm) 4
Left tray
Right tray
<10 degrees
Place screws in same
positions in both sides
(as shown below)
Incline angel <10
degrees (as shown
below)
Vertical
installation as
shown below