Technical Manual

61
The system depend on the setup rule, sift, method of count to
determine the situation whether correct .the system determine these
records which locate without clock-in, clock-out period time setup scope
are invalid. E.g. Mrs. on the 4.march. His attendance record was
determined invalid, and that day, it is only one record, so when the
system statistic, it will be think neglect work, this may be not true at this
situation. the administrator need to know what happen the staff is
forgetting clock-out or leaving on business to unable clock -out, if
forgetting need to patch a clock-out record, if leaving on business, to
patch record on business leave.
The system are able to modify record, which can be determined, and
to correct, the correction situation column is already corrected situation,
while statistic, utilize the situation to count.
Tool column
Change indication color:
able to change various statue appear color
click the window will appear;