INSTALLATION AND OPERATION MANUAL Q.PEAK DUO XL-G10.2 / G10.
TABLE OF CONTENTS 1 2 3 4 5 6 7 8 INTRODUCTION PLANNING 2.1 TECHNICAL SPECIFICATIONS 2.2 REQUIREMENTS 2.3 MOUNTING OPTIONS 2.4 ELECTRICAL LAYOUT INSTALLATION 3.1 SAFETY AND TRANSPORT 3.2 PREPARATION OF INSTALLATION 3.3 MODULE INSTALLATION ELECTRICAL CONNECTION 4.1 SAFETY 4.2 ELECTRICAL INSTALLATION SAFETY 4.3 CONNECTION OF MODULES 4.
1 INTRODUCTION Validity 2 PLANNING 2.1 TECHNICAL SPECIFICATIONS For additional information see the relevant datasheet of the module provided at www.q-cells.us. These instructions are only valid for crystalline solar modules from the company Q CELLS as specified at chapter „2.1 Technical Specifications“. Q CELLS assumes no liability for damage resulting from failure to observe these instructions. Ä Please observe the wiring and dimensioning of the system.
2 PLANNING 2.2 REQUIREMENTS Installation Site Please note the following guidelines that apply to the installation site: • Solar modules are not explosion-proof and are not suitable for use in explosive environments. Ä Do not operate solar modules near highly flammable gas and vapors (e.g. gas tanks, gas stations). Ä Do not install modules in enclosed space. Ä Do not install modules in locations where they may be submerged in water (e.g. floodplains).
2 PLANNING 2.3 MOUNTING OPTIONS TYPE OF INSTALLATION 2 PLANNING 2.3 MOUNTING OPTIONS POINT MOUNTING SYSTEM LINEAR MOUNTING SYSTEM NA INSTALLATION ON MOUNTING POINTS NA 17.9 (454) 17.9 (454) 4× mounting slots FB1 POINT MOUNTING SYSTEM LINEAR MOUNTING SYSTEM NA 35.8 - 37.7 (908 958) TC1 NOT PERMITTED NA IP2 NA 35.8 (908) NA 28.1 (713) TB1a TB1b NA 28.1 (713) 35.8 (908) 35.8 / 28.1 / 17.9 (908 / 713 / 454) 28.1 / 17.
2 PLANNING 2.3 MOUNTING OPTIONS 2 PLANNING 2.3 MOUNTING OPTIONS Specifications MODULE TYPE MOUNTING OPTION Q.PEAK DUO XL-G10.2 CL1a Q.PEAK DUO XL-G10.c CL1b POSITION OF CLAMPS* [MM] 11.8 - 21.7 (300 - 550) CL3 / mCL3 short side: 0.79 - 3.93 (20 - 100) long side: 15.8 - 21.6 (400 - 550) CL5 FB1 FB2 17.
2 PLANNING 2.4 ELECTRICAL LAYOUT Module Selection For detailed key electrical data, please refer to the product data sheet for the respective product. (available at www.q-cells.us). Ä For maximum energy yields, mismatches of specified electric current (IMPP) of more than 5 % should be avoided for all modules connected in series. Safety Factor During normal operation, a module may generate a greater current and / or higher voltage than that determined under standardized test conditions.
3 INSTALLATION 3.1 SAFETY AND TRANSPORT NOTE! Module damage may occur! Ä Never lift or move the module with the connection cables or junction box. Ä Carry modules upright and horizontally as shown. NOTE! Module damage may occur! Ä Do not drop modules. 3 INSTALLATION 3.2 PREPARATION OF INSTALLATION NOTE! Module damage may occur! Ä Never step on modules. Ä Do not subject modules to any mechanical stress. Ä Do not allow any objects to fall onto modules.
3 INSTALLATION 3.3 MODULE INSTALLATION Option 1: Ä Fasten the module with 4 clamps in the specified clamping range, see Fig. 2, p. 7. Ä Tighten clamps according to manufacturer’s instructions. 4 ELECTRICAL CONNECTION 4.1 SAFETY Ä Maintain an interval of at least 0.39 in (10 mm) between two modules along the short side and 0.20 in (5 mm) along the long side. in ) 0.2mm (5 ) 0.39 in (10 mm Option 2: Ä Install the module at the 4 mounting points, see Fig. 2, p. 7.
4 ELECTRICAL CONNECTION 4.2 ELECTRICAL INSTALLATION SAFETY DANGER! Risk of fatal injury due to electric shock! 4 ELECTRICAL CONNECTION 4.3 CONNECTION OF MODULES DANGER! Risk of fatal injury due to electric shock! Ä Electrical work may only be performed by qualified and skilled personnel (see page 3). Ä Ensure correct polarity. Ä Use solar cables for the connection at the junction box outlet. Ä Only interconnect connectors of the same type and manufacturer. Ä Use minimum No.
4 ELECTRICAL CONNECTION 4.4 AFTER INSTALLATION Ä Ensure that all necessary safety and functional tests have been carried out according to applicable standards. Ä Integrate the system into the existing lightening protection system in accordance with the applicable local regulations. 5 NOTE! Module damage may occur! Ä Ensure that the plug connections are secured away from any water-channelling surface. WARNING! Fire Risk! Ä Do not use light concentrators (e.g. mirrors or lenses).
6 FAULTS AND DEFECTS DANGER! Risk of fatal injury due to electric shock! Ä Do not attempt to fix any problems yourself (e.g. glass cracks, damaged cables). Ä Please contact an installer or Q CELLS Technical Customer Service Department. 7 DISPOSAL Ä Do not disconnect modules yourself. Ä Please commission a trade specialist. Ä Dispose of modules in accordance with the local disposal regulations.
8 MAINTENANCE AND CLEANING NOTE! Module damage may occur! Ä Do not clean modules with water if there is a risk of frost. 0° Ä Free the substructure from any dirt and debris (leaves, bird nests, etc.). HANWHA Q CELLS AMERICA INC. 400 Spectrum Center Drive Suite 1400 Irvine, CA 92618 USA TEL +1 949 748 59 69 EMAIL inquiry@us.q-cells.com WEB www.q-cells.us 24 INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2 / G10.c – Q CELLS Subject to change without notice.