  Before a gas boiler may be put into operation and tested, it’s gas connection 
must be leak tested. After installation of oil/gas-fired boiler, operation and 
performance tests shall be conducted to make certain that the burner is operating in 
an acceptable manner and that all safety controls and devices function properly. It is 
critical that the high limit, low water cutoff and burner "cad cell" relay be checked for 
normal operation before leaving the job. 
12. Commissioning 
  The Biasi boiler system should be serviced once a year. 
1.  Inspect the boiler and make sure it is operating normally, i.e. temperature and 
pressure. 
2.  Inspect the Pressure Relief Valve and manually set it off three times to ensure it 
is operating normally and not leaking. 
3.  If a Low Water Cut-Off is installed follow the manufactures suggested 
maintenance and test procedures. 
4.  Adjust room thermostat so there is a call for heat and test boiler high limit for 
proper operation. 
5.  Turn boiler safety switch off. 
6.  Open lower swing door and remove upper clean out plate. 
7.  Brush upper passages first and then clean combustion chamber of any debris 
with brush and vacuum. 
8.  Remove smoke pipe and clean out debris from cleaning or soot build up. 
9.  Inspect smoke pipe for any corrosion before reinstalling. Replace if necessary. 
10. Consult the burner manufacturers manual for annual maintenance of the burner. 
11. Remove all combustible materials from around boiler and ensure the area is free 
of debris so the burner has adequate intake air supply. 
13. Maintenance 
Label all wires prior to disconnection when servicing controls. Wiring errors can 
cause improper and dangerous operation. 
CAUTION 
Verify proper operation after servicing. 