Installation guide

1–Installation
12800-120 Installation
1-16 D000140-001 D
12800-120 Installation
Mounting Hardware Kit Contents:
Support Rails
HAT Brackets
C-Brackets
#8-32 Flat Head Screws
M6 Mounting Screws
M6 Clip Nuts
Installation Tasks
1. If applicable, remove the doors of the rack.
2. Install the clip nuts Install M6 clip nuts in the following locations on EIA rails:
NOTE:
The mounting kit contains all of the necessary parts for installing and
mounting the switch into a 19" 4-post server rack, with a distance between
front and rear rack posts ranging from 28" - 33" (711mm - 838mm).
NOTE:
The mounting kit contains all of the necessary parts for installing and
mounting the switch into a 19" 4-post server rack, with a distance between
front and rear rack posts ranging from 28" - 33" (711mm - 838mm).