Specifications

23Quadra-Fire • QV36DB • 2017-900 Rev. C • 5/05
Figure 25. Ceiling Firestop (Ceiling Side)
If the area above the ceiling IS an attic, position and secure
the firestop on top of the previously framed hole.
NOTE: Keep insulation away from the vent pipe at least
1 inch (25mm).
Figure 26. Attic Firestop
JOIST
CEILING FIRESTOP
CEILING
NAILS (4 REQUIRED)
CEILING
CEILING FIRESTOP
RAFTER
NAILS (4 REQUIRED)
NOTE: There must be NO INSULATION or other
combustibles inside the framed firestop opening.
Figure 27. Trapezoid Termination Cap
7 1/4”
(184mm)
!
C. Vent Termination
Refer to Cinch Pipe and Termination Cap installation in-
structions.
Horizontal Termination
The termination kit should pass through the wall firestops
from the exterior of the building.
Adjust the termination cap to its final exterior position
on the building and interlock the flue sections.
!
WARNING: VENTING TERMINALS SHALL NOT
BE RECESSED INTO A WALL OR SIDING. VENT
TERMINATION CLEARANCES MUST BE FOL-
LOWED TO AVOID FIRE DANGER. SEE VENT TER-
MINATION MINIMUM CLEARANCES DIAGRAM ON
FOLLOWING PAGE.
WARNING: THE TERMINATION CAP MUST BE
POSITIONED SO THAT THE ARROW IS POINTING
UP.