Installation manual

Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R4 • 11/1415
Note         

Two Elbows
INSTALLED
HORIZONTALLY
H
1
H
2
V
1
Figure4.9
2 Elbows to Max. Horizontal
V
1
Minimum H
1
+ H
2
Maximum
 914 mm  
   
   
   
   
   
   
   
   
   
   