Installation Manual
page 2
This guide specifies how the Pro9 headset system should be installed and commissioned.
The LEDs on the base and headset use a sequence of colours, flashes and pulses to
indicate the status of the system and the item, which are explained in this guide.
CONTENTS
Preface page 3
Introduction page 3
What’s in the box page 3
Tools, cabling and equipment required page 3
Installation procedure page 4
Appendix A Installing Pro9 system using existing cabling to page 10
connect the base station to the DTM located in
the order point (Q-P9NTB x2)
Appendix B Installing Pro9 system using existing cabling to page 11
connect the base station to the DTM located in
the building (Q-P9JB x2)
Appendix C Pro9 auxiliary connections (Q-P9ACB) page 12
Appendix D Pro9 repeaters (Q-P9REP) page 13
Appendix E Pro9 table service (Q-P9BSTS) page 14
Appendix F Connecting a computer to Pro9 base station page 15
Appendix G Connecting a computer to Pro9 base station page 16
using a wireless adaptor
Appendix H Setting up Pro9 as dual lane/tandem configuration page 18
(Q-P9BSDL)
Appendix I Recording a ‘Pull forward’ message page 20
Trouble shooting page 22
Manufacturer’s notes page 24
Headset transition table page 25
Regulatory notices page 26
Pro9 system components page 27










