Owner's manual

SIDE WALL STAGING BRACKET
MODEL #2300, #2301
CONSTRUCTION
PRODUCTS
Customer Supprt and Ordering Information
781-344-1000 • www.qualcraft.com
INSTRUCTIONS FOR INSTALLATION
AND USE OF STAGING BRACKET
MODEL #2300
CAPACITY: Capacity of the Model #2300
Staging Bracket is two men per staging plus
75 lbs.
GENERAL REQUIREMENTS: The brackets
may be spaced no more than 8 ft. apart. The
platform shall consist of not less than 2 inch
x 10-inch planks extending not more than
10 inches or less than 6 inches beyond each
staging bracket. The platform of each staging
bracket must be fully planked. Do not nail stag-
ing brackets onto the wall for support. Guardrails
and toe boards must be used on all staging 6 ft. or more above the ground.
Always use a Qual-Craft Model #2301 Guardrail Holder with the installation
of each staging bracket.
INSTALLATION INSTRUCTIONS: WARNING: Do not install staging bracket
scaffolding directly onto walls constructed of sheathing materials other than
inch thick exterior grade plywood. To install rst bracket choose a location
between two interior studs that is no more than 2 inches from one of the studs
and drill a 5/8 inch clearance hole. Prepare a 2”x 4” plank (clear - no knots or
cracks) long enough to span the interior studs and drill a 5/8” clearance hole
in the center of the 4” face in a location corresponding to the exterior hole
previously drilled. Place the staging bracket against the work wall so that the
bolt protrudes through both the surface hole and the corresponding hole of