ASSEMBLY INSTRUCTION SKU CODE: (WF281615-WF281616-WF281617) SAFETY WARNINGS Follow the information on the warning label appearing on the upper bunk end structure and on the carton... Do not remove waning label from bed. Amway use the recommended size mattress or mattress support, or both, to help prevent the likelihood of entrapment or falls. Surface of mattress must be at least 5 inches below the upper edge of guard rails. Bo not allow children under 6 years to use the upper bunk.
Hardware List Screws 1/4" x100 210 PCs Wood dowel PCs Wood Screws PCs ed a CT 21/4" x 80 mm Half Moon Hex-Head bolts PCs PCs Allen Key 1pc Screws 1/4" x50 21/4" x 25 mm PCs Wood Screws PCs Hex-Head bolts PCs 10 1 n2 21/4" x 15 mm 21/4" x 50 mm 21/4" x 13 mm Canopy head thoughtless Hex-Head bolts PCs Horizontal-Hole bolts PCs n3 n4 5 212 x 110 M86 x 15 mm Wood dowel PCs Wood dowel 22pcs Wood Screws 33pes 16 rd Screws 1/4" x60 21/4" x 35 mm PCs Hex-Head bolts PCs 06/25
Hardware List N Stop Trundles PCs CoO— Assembly Tools Required (Not Included) Wood Handle 21/6" x 25 mm 21/4" x 30 mm apes pests Hex-Head bolts PCs @1/4" x 70 mm Wood dowel PCs Hex-Head bolts PCs Wheels PCs pA 07/25
STE P 1 . Following below illustration Assembly Bottom bed's Headboard. Ming hardware #1 and dowel #2 connect A1 and A2 legs with B1 Frame. Look at detail view for more detail STE P 2: Following below illustration Assembly Bottom beds Headboard. using hardware #3 connect Complementary on step 1) with B3 fo complete LEFT side of Bottom Bed.
STE P 3: Following below illustration Assembly Bottom bed's Foot board. sing hardware #1 and dowel #2 connect A1 and A2 legs with B2 Frame. Look at detail view for more detail 71Z STE P 4: Following below illustration Assembly Bottom beds Headboard. 3 using hardware #3 connect Complemented on step 3) with B3 to complete RIGHT side of Bosom Bed.
NN STE P 5 : Following below illustration Using hardware #4,#5 and dowel #2 follow detail view to Assembly Bottom bed's Headboard(Completed on step 2) and Foothoard{Completed on step 4) with side rail at detail view for more detail PCs PCs PCs 10/25
STE P 7: Following below illustration Assembly Upper bed's Headboard. 1 Ming hardware #1 and dowel #2 connect A3 and Ad legs with B4 Frame. look at detail view for more detail Z STE P 8: Following below illustration Assembly Upper bed's Headboard.
10 6x2pcs | 6x2pces STE Following below illustration Assembly Upper bed's Foot board. Using hardware connect B7 Fi mare with B6 Wood bar Using hardware #7 connect Frame with Bracket #8. detail Look at detail view for more Il PCs PCs PCs 12 J We PCs ind dowel #2 p 8) and lowing below illustration Using hardware follow detail view to Assembly Upper bed's Headboard(Completed on sf STEP 12: « 14/25 (Completed on step 11).
STE Following below illustration: 10 slats D and with Side All C2 by using hal rd #3.
13 a? 4 the Dowel #13 fo nonce on Bottom Bed (Completed on step 6). Using end of Upper Bed legs. STE P 1 4: Following below illustration.
STEP STAIRCASE Using hardware #9 and dowel #14 connect Support Bar (E15) with E1,E10 panels PCs STEP STAIRCASE Using hardware #9 and dowel #14 connect Contemplated on steppe-1) with E2 panel PCs 14 PCs STEP STAIRCASE Using hardware #9 and dowel #14 connect Frame(completed on steppe-2) with E9 panel 17/25
¥ STEP STAIRCASE Using hardware #9 and dowel #14 connect Frame(completed on steppe-8) ith E12 Frame STEP STAIRCASE Using hardware #9 and dowel #14 connect Complaisant on steppe-7) with E7 Panel 19/25
STEP STAIRCASE 15 Using hardware #15 connect Frame(completed on steppe-8) with E4,E5,E6 Panels > g 33pcs STEP STAIRCASE Using hardware #16 connect E13 Frame with E14 Frame 16 PCs 20/25
~N PCs 7 ¥ Specs STEP STAIRCASE Using hardware connect Frame(completed on stop-8) with Frame{completed on steppe-10) and E11 Frame 21/25
STE P 1 8 concentration. ‘YOU HAVE COMPLETED THE BED.