User's Guide

Installation & User Guide
Monitor Installation
Note: Do not attempt to install your DGA-LT1 On-Line Transformer Monitor until you have read and fully
understand the procedures outlined in this document.
Installation of the QualConnex system consists of the following:
Site Preparation
All shipped items have been located
Configuration of website
Required tools for assembly
Assembly and mounting the QGateway with mount
QGateway field installation
Installing the DGA-LT1
Bleeding the DGA-LT1 monitor
Commissioning
Items Shipped
Upon receipt of your transformer monitor, it is important to verify the contents of the shipping carton
with the packing list. After inspection of the contents, please notify Qualitrol via our "contact us" page
at www.qualitrolcorp.com/contact-us/ if there are any missing parts or any signs of damage that may
have occurred in transit. If possible, please retain the original shipping container and packing
materials if it becomes necessary to return the monitor.