Specifications

r
aCk
I
nsTallaTIon
s
ysTem
r
emovIng The
r
aIls
Removing the Rails
Review thoroughly the documentation that is included with the rack cabinet for safety
and cabling instructions. Before installing the rails in the rack cabinet, review the
following guidelines:
!
CAUTION!
THE SERVER MUST NOT BE REMOVED FROM ITS SETUP IN THE RACK FOR
MORE THAN TEN MINUTES TO MAINTAIN PROPER SYSTEM COOLING.
Prerequisite:
Power down the server.
Disconnect all cables and peripherals from the server.
1. Push and hold both retainers outwards to disengage the latches. Then pull the
server out of the rack cabinet.
Note:
Adhere to safe lifting practices when moving the server in and out of the cabinet.
Retainer
Figure 2-4: Removing the Server
2-4