Specifications
5102ch03.fm Draft Document for Review May 12, 2014 12:46 pm
98 IBM Power System S822 Technical Overview and Introduction
Table 3-5 Minimum requirements for HMC V8R8.1.0
PowerVM simplification improves, and simplify the overall end-to-end management,
deployment of virtualization on Power Systems
Comprehensive effort to simplify PowerVM and VIOS management.
Simplification for HMC touch point users as well as programmatic consumers
Simplified and automated initial set up via deploy templates
No touch VIOS management - full GUI management interface
Single point of management for all PowerVM configuration
Integrated performance & capacity metrics
Figure 3-11 on page 99 illustrates new options in the HMC V8R1 available for PowerVM
simplification. Manage PowerVM opens a new window, where an user can view and manage
all the aspects of a PowerVM configuration such as Shared Ethernet Adapter, Virtual
Networks, Virtual Storage using the graphical interface only.
Templates allows specify the configuration details for the system I/O, memory, storage,
network, processor, and other partition resources. An user can use the predefined or
captured templates that are available in the template library to deploy a new system. Two type
of templates are available in the template library:
System Template contains configuration details for system resources, such as system I/O,
memory, storage, processors, network, and physical I/O adapters. You can use these
system templates to deploy the system.
Partition Template contains configuration details for the partition resources. An user can
configure Logical Partitions with the predefined templates or by creating a custom
templates.
Function Minimum requirement
HMC hardware 7042-C08 (deskside), 7042-CR5 (rack-mount) or later
HMC memory 2 GB
VIOS level 2.2.3.3