Installation Guide

Chapter 2 Unpacking the Library
Receiving the Library
6 ACL 4/52 Facilities Planning and Installation Guide
Receiving the Library
2
Follow these guidelines to properly receive the crated library:
Move the crated library as close to the final installation site as possible.
Allow a minimum of six feet in front of the off-load side of the pallet to
ensure that there is enough space to place the ramp used for removing
the library
Figure 6 Space Requirements
for Unloading
Inspect the crate and packing materials for any damage that may
have occurred during shipment. Report any damage to the
shipping company immediately.
Library
Pallet Ramp
Pallet
Unloading Area
(Minimum)
TA00129a
24"
32"
38"
9'