Installation Guide

Appendix B Supplemental Installation Procedures
ACL 4/52 Facilities Planning and Installation Guide 31
Appendix B
Supplemental Installation
Procedures
B
The procedures contained in this appendix are provided for the Field
Service Engineer’s convenience during the installation of the library. If
there are additional tasks that you are asked to perform by the
customer’s System Administrator, refer to
Document No 6211222, ACL
4/52 Operators Guide
.
The following procedures are contained in this appendix:
Defining the library power-up state
Enabling/disabling the auto-clean option
Enabling/disabling the auto-load feature
Loading the library with cartridges (through the load port)
Performing an inventory
Turning the interior light on/off
Note:
The following procedures require familiarity of the library menu
mode.