User`s guide

Chapter 1 Introduction
LED Action Sequences
Quantum DAT 320 User’s Guide 4
Figure 2 Front Panel
Components
LED Action Sequences
Table 2 shows the different pattern sequences of the DAT 320 front-
panel LEDs.
Table 2 LED Action Sequences
Clean
LED
(amber)
Tape
LED
(amber
)
Drive
LED
(amber)
Eject
Button
Ready
LED
(green)
Encrypt
LED
(blue)
LED Sequence Cause Action required
All LEDs ON
The drive is resetting or
running self-test.
If LEDs clear in 15 seconds, no action is required.
If they stay on, power cycle the drive.
All LEDs OFF with no
cartridge in the
drive.
This is normal. No action is required.
All LEDs OFF with
cartridge in the
drive.
There may be a problem
with the cartridge or the
tapedrive.
1 Eject the cartridge and load a known-good
cartridge.If the Ready LED remains off, there
may be a problem with the power supply.
2 Check the power cable connection and make
sure the drive is switched on. (On an external
tape drive the Power LED in the enclosure will
be on when power is on.)
3 If the power supply is present and there is still
a problem, power cycle or reset the drive. If it
still fails, call for service.