Technical data
132 •  BACnet/IP Controller 750-830 
 LED Signaling 
 WAGO-I/O-SYSTEM 750 
BACnet/IP Controller 
Error code 6 " Node configuration error " 
Error 
argument 
Error description  Solution 
5  Initialization error of an 
application protocol 
1. Restart the fieldbus coupler by turning the power 
 supply off and on again. 
6  Maximum process im-
age size exceeded 
1. Reduce the number of bus modules 
7  IP address of the bus 
coupler is repeated sev-
eral times in the network
1. Use an IP address that has not been used in the 
 network 
8  Error during process 
image generation 
1. Reduce the number of bus modules on the node 
9  The project in WAGO-
I/O-PRO CAA differs 
from the SYM_XML 
file or the SYM_XML 
file is missing. The con-
nection between 
WAGO-I/O-PRO CAA 
and BACnet is inter-
rupted. 
1. Check both the project in WAGO-I/O-PRO CAA 
and the SYM_XML file. Both must match. 
Error code 7 -not used- 
Error code 8 -not used- 
Error code 9 - not used - 
Error code 10 "Error during PLC program processing" 
Error 
argument 
Error description  Solution 
1  Error while applying 
the PFC runtime sys-
tem 
1. Restart the fieldbus coupler by turning the power 
 supply off and on again. 2. Please contact I/O 
 Support if the error continues. 
2  Error while generating 
the PFC inline code 
1. Restart the fieldbus coupler by turning the power 
 supply off and on again. 
2. Please contact I/O Support if the error continues. 
3  An IEC task has ex-
ceeded the maximum 
runtime, or the call 
interval for the IEC 
task could not be main-
tained (timeout) 
1. Check the task configuration with regard to the set 
 call intervals and monitoring times. 










