Technical data
200  •  Fieldbus Communication 
 BACnet/IP 
 WAGO-I/O-SYSTEM 750 
BACnet/IP Controller 
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
Light switching
Caretaker with
main switch
Priority array
1ON
2
3
4
5
6
7 OFF
8ON
9
10
11
12
13
14
15
16
Property
Value
Priority
Present_Value
OFF
7
Property
Value
Priority
Present_Value
ON
8
Property
Value
Priority
Present_Value
ON
1
Employee with
light switch
Switch for
vacacion operation
Fig. 4-1: Examples of a prioritization 
  G083015e1-4 
Minimum On/Off 
Some objects, such as the Binary Output Object, have the properties "Mini-
mum_Off_Time" and "Minimum_On_Time". If these properties are assigned 
values (Unsigned32), these indicate within seconds how long the current state 
must be maintained before another can occur. In this way, the frequency of 
switching is controlled. A minimum on or off time is, for example, used to 
control sun blinds for shading a building. We do not want the blinds to go up 
or down every minute depending on the cloud cover; rather, we want them to 
close during longer periods of sunshine and to be up in a secure position dur-
ing bad weather or long-lasting storms. 
Example: 
Control of the sun blinds in an office complex is effected through the Write-
Property services of three devices (switches). All three services deliver a pri-
ority parameter together with the command to the blinds to go up and down 
(UP/DOWN). This parameter is entered in the priority list in the object that 
controls the sun blinds. Now the value of the Present_Value of the object that 
features the highest priority (lowest number) is accepted. In this example, a 
300 second Minimum_On_Time and a 600 second Minimum_Off_Time is as-
sumed. This means that the minimum time that the sun blinds can stay in the 
highest position is 5 minutes, and only after this time has elapsed can new 
switching tasks be carried out. The minimum off time, in which the sun blinds 
are closed, must be at least 10 minutes before switching back. 










