Waterproofing with ChemLink's E-Curb Penetration Seal System

Place E-Curb sections to form a circle
around the QBase, making sure to lock
them together. Press firmly in place
until excess adhesive extrudes from the
outside edges.
Apply M-1 around circumference of
E-Curbs and where the two sections
intersect. Use the wooden spatula to
spread the sealant to form a smooth
surface.
Fill the E-Curb cavity to the top with
Chem Link's 1-Part solution.
2
3
5
4
6
1
QBase Low Slope Mount | QMLSH
Waterproofi ng with Chem Link's E-Curb Penetration Seal System
Install QBase to structural member. For
more details refer to the QBase Low
Slope installation instructions.
Seal around the base of mount using
Chem Link's M-1. Coat the QBase, bolts
and post with M-1 to 3" above roof line.
Apply three " beads of M-1 to the flat
base of both E-Curb sections.
925-478-8269 • www.quickmountpv.com • info@quickmountpv.com
2700 Mitchell Dr. • Walnut Creek, CA 94598
Jan-2017, Rev 1
BI 7.2.3-41
©
2017 by Quick Mount PV. All rights reserved.
Materials Required: Chem Link's 5" E-Curb, M-1 Structural Adhesive/Sealant, 1-Part Pourable Sealant
For use on: granulated modified bitumen, asphalt and coal tar B.U.R. (built up roofing), PVC, PIB, and TPO single ply roofing
membranes. TPO Primer is required for use with TPO.
NOTE: Be sure to thoroughly read and follow manufacturer instructions for installing Chem Link's E-Curb Penetration System.
Find instructions here: www.chemlink.com/e-curb

Summary of content (1 pages)