Installation Guide







;
7+58
&/($5$1&()25
+$5':$5(
4%$6(,7(0$1'3267,7(0
$9$,/$%/(,1$1'+(,*+76
$9$,/$%/(,10,//&/($5$12',=('
$1'%521=($12',=('),1,6+(6
,7(0
12
'(6&5,37,21
47<
&$36&5(:+(;+($';81&$*5$'(
4%$6(,')25+$5':$5($&$67$/
/$*6&5(:+(;+($';=,1&
32672';770,//
:$6+(56($/,1*,';2'(3'0%21'('66
:$6+(5)(1'(5,';2'66
:$6+(563/,7/2&.,'66
&$36&5(:+(;+($';81&$66
'21276&$/('5$:,1*
6+((72)
5$'
6&$/(
:(,*+7
5(9
$
6,=(
7,7/(
'$7(
'5$:1%<
',0(16,216$5(,1,1&+(6
72/(5$1&(6
)5$&7,21$/

7:23/$&('(&,0$/

7+5((3/$&('(&,0$/

35235,(7$5<$1'&21),'(17,$/
7+(,1)250$7,21&217$,1(',17+,6'5$:,1*,67+(62/(3523(57<2)48,&.0281739$1<5(352'8&7,21,13$5725$6
$:+2/(:,7+2877+(:5,77(13(50,66,212)48,&.0281739,6352+,%,7('
81/(6627+(5:,6(63(&,),('

40/6+4%$6(/2:6/23(
02817

Sources: American Wood Council, NDS 2005, Table 11.2 A, 11.3.2 A
Notes:
1) Thread must be embedded in a rafter or other structural roof member.
2) See IBC for required edge distances.
Lag pull-out (withdrawal) capacities (lbs) in typical lumber:
Lag Bolt Specications
Specic Gravity 2/ea 5/16" shaft per 2.5" thread depth 5/16" shaft per 1" thread depth
Douglas Fir, Larch .50 1330 266
Douglas Fir, South .46 1175 235
Engelmann Spruce, Lodgepole Pine (MSR 1650 f & higher) .46 1175 235
Hem, Fir .43 1060 212
Hem, Fir (North) .46 1175 235
Southern Pine .55 1535 307
Spruce, Pine, Fir .42 1025 205
Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) .50 1330 266
QBase Low Slope Mount QMLSH
Jun-2015, Rev 5
BI 7.2.3-5

Summary of content (2 pages)