Installation & Assembly

Quick
Step
®
NatureTEK
Installation Instructions
0328_May/2019
Page 1 of 5
INSTALLATION INSTRUCTIONS
GENERAL
Uniclic® is a revolutionary system for installing laminate floors without using glue. The planks can be clicked together simply,
thanks to the ingenious shape of the tongue and groove. Uniclic® is unique because you can install the planks in two different
ways:
Method A: Angle-In Installation. RECOMMENDED FOR MOST AREAS
Position the plank to be installed at an angle of 20° to 30° to the plank already installed. Move the plank gently up and down
while applying forward pressure. The plank will automatically click into place. You can either insert the tongue into the groove
or the groove onto the tongue. See Diagrams 1A-1B-1C.
Method B: Flat Installation. USE WHEN METHOD A CANNOT BE USED
With Uniclic® you can also tap the planks into each other without lifting using a Uniclic® tapping block (sold separately). To
avoid damaging the planks, tap them together gradually with the tapping block flat on the floor. See Diagrams 2A-2B. Use this
method only in cases where you are unable to use the Angle-In method (see above). The rest of your floor should be installed
using the Angle-In method.
TOOLS FOR INSTALLING THE FLOOR
For best results, follow the installation instructions above. In addition to the regular tools for installing laminate floors (i.e.
hammer, saw, pencil, tape measure, level), you will also need the following accessories:
Installation kit (pull bar, spacers and Uniclic®-adapted tapping block)
UniFix® tool (optional)
Saw: Cut pattern side-down when using a jigsaw, sabre saw or circular saw. Cut pattern side-up when using a laminate
cutter, handsaw, table saw or crosscut saw.
Underlayment system
Finishing moldings
100% silicone sealant
10 FOCUS POINTS
1. Thanks to the Uniclic® system, the floor floats and is installed without glue. You can walk on the floor during and
immediately after installation.
2. With the Uniclic® system, you can choose where you want to begin. Consider the easiest way to install the floor. For
example, installation for right-handed people is optimal from left to right.
3. Make sure the planks are mixed sufficiently so that you do not end up with too many identical light or dark planks next to
each other.
4. Check all planks in daylight before and during installation. Do not use any defective planks.
5. The floor should be installed parallel to the light entering the room. The required conditions are 60°-85°F at a relative
humidity of 35-65%.
6. Acclimation: All 7mm products must acclimate for 48 hours in its sealed packaging in the middle of the room where
it is to be installed. Under normal conditions*, all other flooring requires no acclimation period. Outside of the normal
conditions, let the planks acclimate for 48 hours in the unopened packaging at the normal room temperature in the
middle of the room where the floor is to be installed. *Normal conditions means a difference of no more than 25°F
and 20% relative humidity between the stocking/ transportation environment of the flooring and the final installation
environment of the flooring.
7. Room humidity varies according to season, so it is vital that the floor is able to expand and contract. Be sure to leave a
3/8-inch minimum expansion joint on all sides of the floor, around pipes, thresholds, under doors and around any fixed
objects (floor vents, kitchen islands, etc.).
8. Large rooms must have expansion joints every 50 feet width-wise to the planks and every 50 feet length-wise. An

Summary of content (5 pages)