Installation Guide

1
Quick Step Studio Laminate Flooring Installation Instructions
For more information, visit QuickStepatLowes.com or call 1-888-387-9882
2019_0202_QS_LOW_INST
10' (3 m)
)mm 031( "5 >
nigriv )mm 51.0( lim 6
polyethelene vapor barrier
ground
)mm 002( "8 >
Site Requirements
Laminate is a durable floor covering, not intended as structural
material. Laminate requires a clean, dry, secure subfloor that
meets building codes.
The following requirements are not intended to supersede federal,
state or local building codes, but as with many other interior finish
products, may require modifying existing structural components
for successful installation. Owner assumes responsibility for
compliance with all building codes.
Laminate floor is suitable for use in climate controlled (35-65% RH
and 60-85° F) indoor installations only and should not be installed
over any floor with a sump pump or in a room with a floor drain.
Laminate floor can be installed above, on or below grade.
A moisture test is strongly recommended to determine if high
moisture exists in the subfloor. When using a calcium chloride
moisture test for concrete subfloors (ASTM F1869), values must
be 5 lbs/1000ft²/24-hr or <80% RH with an in situ probe (ASTM
F2170). Moisture readings of wood subfloors must be 12%.
Acceptable job site conditions, including relative humidity and
subfloor moisture conditions, must be maintained throughout the
lifetime of the flooring.
Laminate flooring is installed as a floating floor and requires the
use of T-moldings in doorways 4 ft (1.22m) or less and in rooms
40 feet (12.2 m) or larger in length or width. Floor movement must
not be constrained by glue, nails, screws, hardware or other fixed
obstructions.
This product must be installed in accordance with these
installation instructions.
Job Site
Tools Required for InstallationTools Required for Installation
Common Tools
Wood
Glue
Carbide
40T Blade
Other Tools and Supplies
M
A
D
E
I
N
T
H
E
U
S
A
1
F
L
O
Z
(
3
3
.
5
m
l
)
PREMIUM
SYSTEM
COMPONENT
S
P
E
C
I
A
L
L
Y
D
E
V
E
L
O
P
E
D
F
O
R
L
A
M
I
N
A
T
E
F
L
O
O
R
I
N
G
Finishing
Putty
PREMIUM
SYSTEM
COMPONENT
Finishing
Putty
SILICONE
CAULK
SILICONE
CAULK
SILICONE
CAULK
100% Silicone
Sealant
Felt furniture
pads
Moisture
Meter
ON
Non Destructive Moisture
dlfwej dtra
djflsv
dlfwe vtra
alskdjf
vmwjc
Concrete
Encounter
Plus
0
1
2
3
4
5
6
0
50
100
150
200
250
Moisture
Meter
S
p
a
c
e
r
s
5
m
m
S
p
a
c
e
r
s
5
m
m
Laminate floor tapping
block and 5mm (3/16")
spacers
PE Foam
Backer Rod

Summary of content (14 pages)