Installation Guide

1
Quick Step Studio Laminate Flooring Installation Instructions
For more information, visit QuickStepatLowes.com or call 1-888-387-9882
2018_0202_QS_LOW_INST
10' (3 m)
)mm 031( "5 >
nigriv )mm 51.0( lim 6
polyethelene vapor barrier
ground
)mm 002( "8 >
Site Requirements
Laminate is a durable floor covering, not intended as structural
material. Laminate requires a clean, dry, secure subfloor that
meets building codes.
The following requirements are not intended to supersede
federal, state or local building codes, but as with many other
interior finish products, may require modifying existing structural
components for successful installation. Owner assumes
responsibility for compliance with all building codes.
Laminate oor is suitable for use in climate controlled (35-65%
RH and 60-8F) indoor installations only and should not be
installed in rooms with floor drains or sump pumps. Laminate
floor can be installed above, on or below grade.
A moisture test is strongly recommended to determine if high
moisture exists in the subfloor. When using a calcium chloride
moisture test for concrete subfloors (ASTM 1869), values must be
5 lbs/1000f/24-hr or <80% RH with an in situ probe (ASTM
F2170). Moisture readings of wood subfloors must be 12%.
Acceptable job site conditions, including relative humidity and
subfloor moisture conditions, must be maintained throughout
the lifetime of the flooring.
Laminate ooring is installed as a floating floor and requires the
use of T-moldings in doorways 4 ft (1.22m) or less and in rooms
40 feet (12.2 m) or larger in length or width. Floor movement
must not be constrained by glue, nails, screws, hardware or other
fixed obstructions.
This product must be installed in accordance with these
installation instructions.
Job Site
Tools Required for InstallationTools Required for Installation
Common Tools
Wood
Glue
Carbide
40T Blade
Other Tools and Supplies
M
A
D
E
I
N
T
H
E
U
S
A
1
F
L
O
Z
(
3
3
.
5
m
l
)
PREMIUM
SYSTEM
COMPONENT
S
P
E
C
I
A
L
L
Y
D
E
V
E
L
O
P
E
D
F
O
R
L
A
M
I
N
A
T
E
F
L
O
O
R
I
N
G
Finishing
Putty
PREMIUM
SYSTEM
COMPONENT
Finishing
Putty
SILICONE
CAULK
SILICONE
CAULK
SILICONE
CAULK
Mildew-resistant
silocone
Felt furniture
pads
Moisture
Meter
ON
Non Destructive Moisture
dlfwej dtra
djflsv
dlfwe vtra
alskdjf
vmwjc
Concrete
Encounter
Plus
0
1
2
3
4
5
6
0
50
100
150
200
250
Moisture
Meter
S
p
a
c
e
r
s
5
m
m
S
p
a
c
e
r
s
5
m
m
Laminate floor tapping block
and 5mm (3/16") spacers

Summary of content (14 pages)