Installation manual
Fig 3
QK-H300 QK-H400
α = 90° α = 95°° α = 90° α = 95°
B (mm) B (mm) B (mm) B (mm)
A (mm)
min
max
A (mm)
min
max
A (mm)
min
max
A (mm)
min
max
100
120
170
120
130
170
110
120
250
120
120
220
110
120
170
130
130
170
120
120
250
130
120
220
140
120
150
150
120
250
160
120
210
L MAX (mm)
1010
200
120
190
210
120
160
210
120
190
220
120
160
220
120
180
230
120
130
230
120
160
240
120
120
Table 1
4- Temporary fix the actuator to the wall and to the leaf (tack weld) and turn the
leaf gate from the close position up to the max. open position (normally 95°) and
check that the leaf turn freely in the hinges and without any swing during its
movement.
5- Provide to complete the assembly of the actuator to the wall and to gate leaf.
6- Connect to the power supply cable 4x1,5 sqmm
7- Proceed with the control board programming (see the CONTROL BOARD
USER MANUAL )
Adjust the actuator thrust acting with the screwdriver on the by pass valves #14