Installation Guide
1of2
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
or visit us on-line at www.quoizel.com
2015 QuoizelInc.
Assembly Instruction Sheet #IS-ADA5009LN
For Style ADA5009LN
Pleasegoto forproduct cleaningtips. Goto the selection.
(9)B10 CandelabraBase 60WMaximum.
30-45minutes
Identifyand inspectall partsbefore beginninginstallation. Checkpackage contentlist anddiagrams belowto besure allparts are
present.If anyparts aremissing ordamaged, donot attemptto assemble,install, oroperate thefixture. Contactcustomer servicefor replacement
parts.
www.quoizel.com Care+ Maintenance
LightSource:
EstimatedAssemblyTime:
Preparation:
ToolsRequired:Flathead screwdriver,Phillips screwdriver,pliers, wirecutters, wirestrippers, electricaltape, safetyglasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
B
6” Rod
x2
C
12” Rod
x2
August2015
Package Contents
A
Fixture
Loop
x1
E
Fixture
Body
x1
Shade
x9
D
Hardware Contents
AA
BB
CC
DD
EE
FF
Crossbar
x1
Lock Washer
x2
Hex Nut
x2
Nipple
x1
Canopy
Chain Loop
x1
Canopy Lock
Ring
x1
Ceiling
Canopy
x1
GG
HH
Quick Link
x1
STEP 1 Assemble the Rods
and the Fixture Loop
-
A. Determine the Rods (B/C) to
be assembled to the Fixture
Body (E) according to your
hanging height.
B. Pass the supply wires and
ground wire through the
chosen rods (B/C) and the
Fixture Loop (A). Thread the
Fixture Body (E), the chosen
Rods (B/C) and the Fixture
Loop (A) together. Hand
tighten until snug.
Figure 1
Supply Wires
and Ground Wire
C
A
C
B
B
E
(Step 1 Continued)
Suggested rods for Ceiling height :
8’ ceiling : use (1) 6” rod and (1) 12” rod
9’ ceiling : use (1) 6” rod and (2) 12” rods
10’ ceiling: use (2) 6” rods and (2) 12” rods
STEP 2 Install Crossbar-
A. AA)Attach the Crossbar ( to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included) Tighten until snug..
Figure 2
Outlet Box
Outlet Box Screw
(not included)
Green Ground
Screw
AA
AA
BB
CC
Step B
Step A
DD
CC
BB
EE
HH
FF
Figure 3
STEP 3 Install Canopy Chain Loop and Nipple-
* Pliers is required for this step.
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end
of the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.
B. Thread another Hex Nut (CC) to the middle of the Nipple (DD).
Place another Lock Washer (BB) over the Nipple (DD) and then
Thread the Nipple (DD) into the Crossbar (AA) until the Nipple (DD)
is about 0.375” above the Crossbar (AA).
C. Remove the Canopy Lock Ring (FF)
from the Canopy Chain Loop (EE).
Place the Ceiling Canopy (HH) over
the Canopy Chain Loop (EE) against
the ceiling to determine the correct
position of the Nipple (DD). Thread
the Canopy Lock Ring onto the
Canopy Chain Loop (EE). Adjust the
Nipple (DD) to allow the Ceiling
Canopy (HH) to rest against the
ceiling when held in place by the
Canopy Lock Ring (FF).
D. Remove the Canopy Lock Ring (FF)
and the Ceiling Canopy (HH). Tighten
the Hex Nut (CC) against the
Crossbar (AA) to secure in place.