Installation Guide

Warnings and Cautions
1of2
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
or visit us on-line at www.quoizel.com
2014 QuoizelInc.
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
Package Contents
A
Hardware Contents
Shade
x18
AA
BB
CC
DD
EE
FF
II
Crossbar
x1
Lock Washer
x2
Hex Nut
x2
Nipple
x1
Canopy Chain
Loop x 1
Canopy Lock
Ring x 1
Ceiling Canopy
x1
GG
Fixture Chain
x1
HH
Quick Link
x2
JJ
Tuck Washer
x1
KK
Mounting Screw
x2
STEP 1 Install Crossbar and Ceiling Canopy-
* Pliers is required for this step.
Drill a 5/8” diameter clearance hole on the top inside center of the
Oulet Box and through the Structural Support Member. Place
Crossbar (AA) onto Outlet Box and line up mounting holes with a set
of holes on Crossbar (AA). Thread Outlet Box Screws (not supplied)
into the mounting holes on the Outlet Box and tighten until snug to
secure the Crossbar (AA). By using a screwdriver, thread Mounting
Screws (KK) into the Structural or Bridging Member and tighten until
snug.
B. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end
of the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.
C. Thread another Hex Nut (CC) to the middle of the Nipple (DD).
Place another Lock Washer (BB) over the Nipple (DD) and then
A.
ToolsRequired:Flathead screwdriver,Phillips screwdriver,pliers,wire cutters, wirestrippers, electricaltape,safety glasses.
BulbRecommended:
EstimatedAssemblyTime:
Preparation:
(18)Candelabra Base60W Maximum
30-45minutes
Identifyand inspectall parts beforebeginning installation.Check package contentlist anddiagramsbelow tobe sureallparts are
present.If anyparts are missingor damaged,do not attemptto assemble,install,or operatethe fixture. Contactcustomer servicefor replacement
parts.
Assembly Instruction Sheet #IS-AME5018IB
For Style AME5018IB
thread the Nipple (DD) into the
Crossbar (AA) until the Nipple (DD)
is about 0.375” above the Crossbar
(AA).
D. Remove the Canopy Lock Ring (FF)
from the Canopy Chain Loop (EE).
Place the Ceiling Canopy (II) over
the Canopy Chain Loop (EE)
against the ceiling to determine the
correct position of the Nipple (DD).
Thread the Canopy Lock Ring (FF)
onto the Canopy Chain Loop (EE).
Adjust the Nipple (DD) to allow the
Ceiling Canopy (II) to rest against
the ceiling when held in place by the
Canopy Lock Ring (FF).
D. Remove the Canopy Lock Ring (FF)
and the Ceiling Canopy (II). Tighten
the Hex Nut (CC) against the
Crossbar (AA) to secure in place.
Structural or
Bridging Member
Drill a 5/8”
Dia. Hole
Outlet Box
AA
Outlet Box
Screw (not
Supplied)
DD
BB
CC
BB
KK
EE
II
FF
Figure 1
D
Socket
Assembly
x1
B
C
Side Arm A
x2
Side Arm B
x2
STEP 2 Attach Side Arms-
A. Attach Side Arms A (B) to the Hooks
on the upper tier and attach Side
Arms B (C) to the Hooks on the
second tier as shown.
Figure 2
B
D
Hook
C
Hook
Upper
Tier
Second
Tier
STEP 3 - Install Fixture Chain, Safety Cable and Ceiling Canopy
A. Adjust Fixture Chain (GG) to your desired length by removing the
links if needed.
Pliers is required for this step.
B. With Fixture Chain (GG) not attached to Fixture Loop (A) and
Canopy Chain Loop (EE), pull supply wires and safety cable
through Fixture Chain (GG) alternating links. After wires and safety
cable are through Fixture Chain (GG), pull Supply Wires, Ground
Wire and safety cable through Canopy Lock Ring (FF) and Ceiling
Canopy (II) in order.
C. Attach one end of Fixture Chain (GG) to Fixture Loop (A) with one
*
September2014

Summary of content (2 pages)