Installation Sheet

1of2
For Style ANX1509AN
Package Contents
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Pleasegoto forproductcleaningtips.Gotothe selection.
(1)A19MediumBaseBulb100WMaximum,MediumBaseVintageBulbisrecommended,bulbnotincluded.
MinimumHangingHeightis13.75”,MaximumHangingHeightis52”.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtoensureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactyouroriginalplaceofpurchase.
www.quoizel.com Care+Maintenance
LightSource:
FixtureHangingHeight:
EstimatedAssembly Time:
Preparation:
ToolsRequired:Flatheadscrewdriver,Phillipsscrewdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Installation Guide #IS-ANX1509AN
G
2018 QuoizelInc.
ReleasedDate:2018-10-08
visit us on-line at www.quoizel.com
Socket Collar
x1
E
Mesh Shade
x1
Ceiling Canopy
x1
C
6” Rod
x2
D
12” Rod
x2
B
A
Crossbar
Assembly
x1
Fixture Body
x1
STEP 1 Install Ceiling Canopy and
Rods to Fixture Body
-
A. By using Allen Wrench (H), double
check set screws on the joint of the
Fixture Body (E) to make sure they
are tighten properly.
B. Tighten the lock screw to secure the
joint of the Fixture Body (E).
C. Determine the Rods (B/C) to be
assembled to the Fixture Body (E)
according to your hanging height.
Figure 1
Supply Wires
and Ground Wire
C
B
B
C
E
D
Supply Wires with
Ground Wire
Outlet Box Screws
(not included)
Outlet Box
A
STEP 2 - Installing the Crossbar Assembly
A. Pass the supply wires from outlet box through the Crossbar
Assembly (A). Attach the Crossbar Assembly (A) to the Outlet Box
with the head of the Green Ground Screw facing you. Secure the
Crossbar Assembly (A) with Outlet Box Screws (not included).
Tighten until snug.
STEP 3 Test Fitting Ceiling Canopy to Crossbar Assembly-
A.
eiling Canopy to the
ceiling
Remove mounting balls from the Crossbar Assembly (A). Fit the
C (D) Crossbar Assembly (A) and secure with
mounting balls. Note: The should be snug
against the and the mounting balls. If
Ceiling Canopy (D)
not, adjust the length of
the nipple on the Crossbar Assembly (A) by unscrewing the
preassembled hex nut and lock washer and then screwing the
mounting screws in or out of the crossbar until the correct length is
achieved. Once the Ceiling Canopy (D) is secure, remove the
mounting ball and Ceiling Canopy (D).
Mounting Screw
Hex Nut and
Lock Washer
Mounting Ball
A
Ceiling
Canopy
Figure 2
Figure 3
F
H
Allen Wrench
x1
Lock Screw Set Screw
Set Screw
H
H
D. Pass the supply wires and
ground wire through the
chosen rods (B/C) and the
Ceiling Canopy (D). Thread
the Fixture Body (E), the
chosen Rods (B/C) and the
Ceiling Canopy (D)
together. Hand tighten until
snug.
Joint
(Step 1 Continued)
Suggested rods for Ceiling height :
8’ ceiling : use (1) 6” rod and (1) 12” rod
9’ ceiling : use (1) 6” rod and (2) 12” rods
10’ ceiling : use (2) 6” rods and (2) 12” rods

Summary of content (2 pages)