Installation Sheet

1of3
2020 QuoizelInc.
visit us on-line at www.quoizel.com
ReleasedDate:2020-02-28
For Styles BAW1716PK and BAW1716WS
Installation Guide
Crossbar Assembly
x1
A
Package Contents
PARTS BAG
Ceiling Canopy
with Rod
x1
D
Side Arm
x3
F
G
Preparation: Identify and inspect all parts
before beginning the installation.
Missing or damaged parts? Contact your
original place of purchase.
LightSourceToolsRequired
4BULBSREQUIRED
BULBSNOTINCLUDED
Warnings and Cautions
Turn off the electricity at the circuit breaker
before installation. Consult a licensed
electrician if in doubt about installation.
Turn off power to the fixture and allow the
bulbs to cool before replacing.
Outlet Box Screw
x2
B
Wire Connector
x3
C
Glass Shade
x4
H
Crossbar
Assembly
Ceiling Canopy
Assembly
Table of
Contents
STEP 2STEP 1
Side Arm & Cage
STEP 3
Socket Assembly
x1
E
Glass Holder
x4
I
Cage with Glass
x1
BULB BASE TYPE
Candelabra (E12)
BULB SHAPE
TYPE B
60W
MAX
Glass Holder,
Bulb & Shade
STEP 6
Ceiling Canopy
STEP 5
Wiring
STEP 4

Summary of content (3 pages)