Installation Sheet

1of2
For Style BKR1910IA
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Pleasegoto forproductcleaningtips.Gotothe selection.
(1)A21MediumBaseVintageBulb150WMaximum,bulbincluded.
MinimumHangingHeightis23”,MaximumHangingHeightis119”.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtoensureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactyouroriginalplaceofpurchase.
www.quoizel.com Care+Maintenance
LightSource:
FixtureHangingHeight:
EstimatedAssembly Time:
Preparation:
ToolsRequired:Flatheadscrewdriver,Phillipsscrewdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Installation Guide #IS-BKR1910IA
2019 QuoizelInc.
ReleasedDate:2019-01-26
visit us on-line at www.quoizel.com
Package Contents
Hardware Contents
AA
Crossbar
Assembly
x1
BB
CC
Ceiling
Canopy
x1
Fixture Chain
x1
Quick Link
x2
DD
STEP 2 - Install the Crossbar Assembly to Outlet Box and Adjust
the length of the Nipple
A. Attach the Crossbar Assembly (AA) to the Outlet Box with the head
of the Green Ground Screw facing you. Secure it with Outlet Box
Screws (not included), tighten until snug
B. Adjust the hex nut and lock washer underside of the crossbar to the
middle of the nipple.
C. Remove the canopy lock ring from the canopy chain loop. Place the
Ceiling Canopy (DD) over the canopy chain loop against the ceiling
to determine the correct position of the nipple. Thread the canopy
lock ring onto the canopy chain loop. Adjust the nipple to allow the
Ceiling Canopy (DD) to rest against the ceiling when held in place
by the canopy lock ring.
D. Remove the canopy lock ring and the Ceiling Canopy (DD). Tighten
the lock washer and the hex nut against the crossbar to secure in
place.
.
Outlet Box Screw
(not included)
Hex Nut and
Lock Washer
Outlet Box
Green Ground Screw
Canopy Chain Loop
Canopy Lock Ring
Nipple
DD
AA
Figure 2
A
Fixture Loop
x1
B
Fixture
Body
x1
C
Glass Shade
x1
D
Socket Collar
x2
F
Edison
Bulb
x1
E
Washer
x1
STEP 1 Install Fixture Loop and
Glass Shade
-
A. Thread the Fixture Loop (A) onto
the Fixture Body (B). Hand tighten
until sung.
B. Place the Glass Shade (C) and
the Washer (D) over the Socket
and secure with one Socket Collar
(E). Hand tighten until snug.
Proceed to thread another Socket
Collar (E) onto the Socket.
A
C
B
E
Figure 1
Socket
E
D
STEP 3 - Install the Fixture Chain and Ceiling Canopy
A. Adjust the Fixture Chain (BB) to your desired length by removing
links if needed. Put a cloth over the Fixture Chain (BB) to protect the
finish.
B. Pull the supply wires through the Fixture Chain (BB) alternating
links. After the wires are through the Fixture Chain (BB), pull the
Supply Wires and the Ground Wire through the canopy lock ring and
the Ceiling Canopy (DD) in order.
C. Attach one end of the Fixture Chain (BB) to the fixture loop with one
Quick Link (CC). Lift the fixture and Fixture Chain (BB) up and attach
the other end of the Fixture Chain (BB) onto the canopy chain loop
with another Quick Link (CC). The fixture will now hang safely.
D. Feed the Supply Wires and Ground Wire through the canopy chain
loop and nipple into the outlet box. Cut the wires leaving
approximately 8” of wire extending from the Outlet Box.
E. Go to Step 4 for wire connections and follow the directions. Return
to Step F in this step when complete with Step 4.
F. Raise the Ceiling Canopy (DD) and canopy lock ring up the

Summary of content (2 pages)