Installation Guide

Pleasegoto forproductcleaningtips.Gotothe selection.
(3)A19MediumBase100WMaximum,Alternatebulb(3)23WCFL
www.quoizel.com Care+Maintenance
LightSource:
ToolsRequired:Flatheadscrewdriver, Phillips screwdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
EstimatedAssembly Time:30-45minutes
1of2
Assembly Instruction Sheet #IS-BNY2816C_R1
For Style BNY2816C
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184
or visit us on-line at www.quoizel.com
2016 QuoizelInc.
RevisedDate:2016-05-06
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering June result.
Shade Assembly
x1
Package Contents
A
Crossbar
Assembly
x1
B
6” Rod
x2
C
12” Rod
x2
D
Ceiling
Canopy
x1
E
F
Center Stem
x1
H
G
Rubber
Washer
x1
Flat
Washer
x1
I
Bottom
Diffuser
x1
Preparation:Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
J
Top Diffuser
x1
STEP 1 - Attach Top Diffuser to Socket Assembly
Quoizel recommends (2) people for this step.
A. With one person hold Socket Assembly, another person remove Lock
Balls and Washers from Shade Assembly (E). Attach Top Diffuser (J)
E
J
Bolt
Socket Assembly
J
Lock Ball
Washer
onto top of Shade
Assembly (E) and pass
holes over bolts. Secure by
threading Washers and
Lock Balls onto Bolts and
hand tighten until snug.
Figure 1
STEP 2 - Install Ceiling Canopy, Rods and Shade Assembly
together
A. Determine Rods (B/C) to be assembled to the Shade Assembly (E)
according to your hanging height.
B. Pass the supply wires and ground wire
through the chosen rods (B/C) and the
Ceiling Canopy (D). Thread the Shade
Assembly (F), the chosen Rods (B/C) and
the Ceiling Canopy (D) together. Hand
tighten until snug.
Suggested rods for Ceiling height :
8’ ceiling : use (2) 12” rods
9’ ceiling : use (2) 6” rods and (2) 12” rods
D
B
B
C
C
Supply Wires
and Ground Wire
E
Figure 2
STEP 3 Install Crossbar Assembly-
A. Pass the supply wires through the Crossbar Assembly (A). Attach
the Crossbar Assembly (A) to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included). Tighten until snug.
Supply Wires with
Ground Wire
A
Outlet Box Screws
(not included)
Outlet Box
Figure 3
STEP 4 Fit Ceiling Canopy to Crossbar Assembly-
A.
Ceiling Canopy to the
Ceiling Canopy
Remove mounting balls from the Crossbar Assembly (A). Fit the
(D) Crossbar Assembly (A) and secure with
mounting balls. Note: The (D) should be snug
L
Finial
x1
K
Hex Nut
x1

Summary of content (2 pages)