Installation Guide

Package Contents
ToolsRequired:Flatheadscrewdriver, Phillips screwdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
BulbRecommended: (3)MediumBase100WMaximum,Alternatebulb(3)23WCFL
EstimatedAssembly Time:
Preparation:
20-30minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
Warnings and Cautions
1of2
Assembly Instruction Sheet #IS-CKCF339OS
For Style CKCF339OS
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
or visit us on-line at www.quoizel.com
2014 QuoizelInc.
July2014
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering July result.
STEP 1 Assemble the Rods and the Fixture Loop-
A. Determine the Rods (B/C/D) to be assembled to the Shade
Assembly (F) according to your hanging height.
B. Pass the supply wires and ground wire through the chosen rods
(B/C/D) and the Ceiling Canopy (E). Thread the Shade Assembly
(F), the chosen Rods (B/C/D) and the Ceiling Canopy (E) together.
Hand tighten until snug.
Suggested rods for Ceiling height :
8’ ceiling : use (2) 12” rods
9’ ceiling : use (2) 6” rods and (2) 12” rods
Crossbar Assembly
x1
STEP 3 Fit Ceiling Canopy to Crossbar Assembly-
A. Remove mounting balls from the Crossbar Assembly (A). Fit the
Ceiling Canopy (E) to the Crossbar Assembly (A) and secure with
mounting balls. Note: The Ceiling Canopy (E) should be snug
against the ceiling and the mounting balls. If not, adjust the length
of the nipple on the Crossbar Assembly (A) by unscrewing the
preassembled hex nut and lock washer and then screwing the
mounting screws in or out of the crossbar until the correct length is
achieved. Once the Ceiling Canopy (E) is secure, remove the
mounting ball and Ceiling Canopy (E) and proceed to Step 4.
Mounting
Screw
Hex Nut and
Lock Washer
E
A
Mounting Ball
Figure 3
Shade
Assembly
x3
B
6” Rod
x6
A
F
2.4 mm2.4 mm
13 Ga13 Ga
R
G
N
D
Ceiling Canopy
x1
E
D
12” Rod
with Nipple
x3
C
12” Rod
x3
B
B
C
D
F
E
Figure 1
Figure 2
STEP 2 Install Crossbar Assembly-
.
A. Pass the supply wires through the Crossbar Assembly (A). Attach
the Crossbar Assembly (A) to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included). Tighten until snug
Supply Wires with
Ground Wire
A
Outlet Box Screws
(not included)
Outlet Box
STEP 4 - Attach Lanyard
A. The purpose of the lanyard is to provide the installer a means to
support the fixture from the junction box while connecting the
electrical wires. This enables the fixture to hang from the junction
box and your hands are free to make the wire connections.
Crossbar
Button Stop
Lanyard
Slot
Figure 4

Summary of content (2 pages)