Installation Guide

1of3
Assembly Instruction Sheet #IS-CPT1910PN
For Style CPT1910PN
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Package Contents
Hardware Contents
AA
BB
CC
DD
EE
FF
II
Crossbar
x1
Lock Washer
x2
Hex Nut
x2
Nipple
x1
Canopy
Chain Loop
x1
Canopy Lock
Ring
x1
Ceiling
Canopy
x1
GG
Fixture Chain
x1
HH
Quick Link
x2
Pleasegoto forproductcleaningtips.Gotothe selection.
(1)A21MediumBaseBulb150WMaximum
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssembly Time:
Preparation:
ToolsRequired: Flathead screwdriver,Phillips screwdriver,pliers, wire cutters, wire strippers, electrical tape, safety glasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
2017 QuoizelInc.
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184
or visit us on-line at www.quoizel.com
Fixture Body
x1
A
ReleasedDate:2017-04-21
Figure 1
STEP 1 Remove Styrofoam
inside of the Cage
-
A. Unscrew lock screws on the
fixture hood by using screwdrivers
and remove the cage from the
fixture body.
B. Carefully remove the Styrofoam
inside of the cage.
C. Place the cage back onto the
fixture body and secure with
previously removed lock screws.
Tighten until snug with
screwdrivers.
Lock
Screw
Styrofoam
Cage
Fixture Body
STEP 3 Install the Canopy Chain Loop and Nipple-
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end of
the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.
B. Thread another Hex Nut (CC) to the middle of the Nipple (DD). Place
another Lock Washer (BB) over the Nipple (DD) and then thread the
Nipple (DD) into the Crossbar (AA) until the Nipple (DD) is about
0.375” above the Crossbar (AA).
C. Remove the Canopy Lock Ring (FF) from the Canopy Chain Loop
(EE). Place the Ceiling Canopy (II) over the Canopy Chain Loop
(EE) against the ceiling to determine the correct position of the
AA
BB
CC
Step B
Step A
DD
CC
BB
EE
II
FF
Figure 3
Nipple (DD). Thread the
Canopy Lock Ring onto
the Canopy Chain Loop
(EE). Adjust the Nipple
(DD) to allow the Ceiling
Canopy (II) to rest against
the ceiling when held in
place by the Canopy Lock
Ring (FF).
D. Remove the Canopy Lock
Ring (FF) and the Ceiling
Canopy (II). Tighten the
Hex Nut (CC) against the
Crossbar (AA) to secure
in place.
STEP 2 Install the Crossbar to the junction box-
.
A. Attach the Crossbar (AA) to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included), tighten until snug
Figure 2
Outlet Box
Outlet Box Screw
(not included)
Green Ground
Screw
AA

Summary of content (3 pages)