Installation Sheet

For Style DNY1714BN
Installation Guide #IS-DNY1714BN
1of2
Pleasegoto forproductcleaningtips.Gotothe selection.
(3)A19MediumBase100WbulbMaximum,bulbnotincluded.
20-30minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.MissingParts?Contactyouroriginalplaceof
purchase.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssembly Time:
Preparation:
ToolsRequired:Flatheadscrewdriver, Phillips screwdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Package Contents
A
Crossbar
Assembly
x1
B
2018 QuoizelInc.
visit us on-line at www.quoizel.com
STEP 2 - Installing the Crossbar Assembly
A. Pass the supply wires from outlet box through the Crossbar
Assembly (A). Attach the Crossbar Assembly (A) to the Outlet Box
with the head of the Green Ground Screw facing you. Secure the
Crossbar Assembly (A) with Outlet Box Screws (not included).
Tighten until snug.
Supply Wires with
Ground Wire
Outlet Box Screws
(not included)
Outlet Box
A
Figure 2
STEP 3 Test Fitting Ceiling Canopy to Crossbar Assembly-
A.
Ceiling Canopy to the
Ceiling Canopy
ceiling
Remove mounting balls from the Crossbar Assembly (A). Fit the
(B) Crossbar Assembly (A) and secure with
mounting balls. Note: The (B) should be snug
against the and the mounting balls. If not, adjust the length
of the nipple on the Crossbar Assembly (A) by unscrewing the
preassembled hex nut and lock washer and then screwing the
mounting screws in or out of the crossbar until the correct length is
achieved. Once the Ceiling Canopy (B) is secure, remove the
mounting ball and Ceiling Canopy (B) and proceed to Step 4.
Mounting Screw
Hex Nut and
Lock Washer
Mounting Ball
A
B
STEP 4 - Wire Connections
A. Wrap bare or green ground wire around green ground screw on the
crossbar, no less than 2 inches from the end of the wire. Tighten the
green ground screw.
B. Use standard wire connectors (not included) to make all wire
connections. Twist connectors until wires are tightly joined together.
Wrap each connection with approved electrical tape and carefully
stuff all the connected wires into the Outlet Box.
Figure 4
Green Ground Screw
on the Crossbar
White wire
from outlet box
White wire
from fixture
Black wire from
outlet box (or Red)
Black wire
from fixture
Bare, or Green
Ground wire
from outlet box
Ground wire
from Fixture
ReleasedDate:2019-02-21
C
Socket Assembly
x1
D
Lock Screw
x3
E
Shade
x1
B
Figure 1
Figure 3
STEP 1 - Installing the Ring and
Shade
a. Remove Lock ball from the Lock
Screw (D).
B. Place the ring (C) onto shade (E) and
align holes on the shade (E) to the
holes on the ring (C). Lift the shade
(E) with ring (C) upward and align
holes on the shade (E) and ring (C) to
the holes on the arm. Pass lock
screws through holes on the arm, the
ring, shade and thread into lock ball.
Hold the lock ball with one hand, tight
the lock screw with another hand
until snug.
E
C
D
Lock ball

Summary of content (2 pages)