Installation Guide

2018 QuoizelInc.
Tools Required
Bulb Recommended:
Estimated Assembly Time
Preparation
Quoizel Customer Service
: Flathead screwdriver, Phillips screwdriver, silicon sealant, wire
strippers, electrical tape, safety glasses.
(3) Candelabra Base 60W Maximum, Alternate (3) LED bulb.
: 20 - 30 minutes
:
Identify and inspect all parts before beginning installation
Check package contents list and diagrams below to be sure all parts are included.
If any parts are missing or damaged, do not attempt to assemble, install or
operate the fixture.
Contact for replacement parts.
·
·
·
·
Turn off electrictiy at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the
fixture. We strongly recommend that a licensed, ptofessional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool
before removal. Do not subject glass parts to any shock while in operation or shattering may result.
Warnings And Cautions
1
Package Contents
Thankyou for purchasing aQuoizel product.
Needassistance withparts orassembly?
CallQuoizel CustomerService tollfree at1-844-564-3055;
send us an email atcs@quoizel.com orvisit usonline atwww.quoizel.com
6 Corporate Parkway
Goose Creek
SC 29445
Customer Service
Toll Free Phone
E-mail
:
1-844-564-3055
:
cs@quoizel.com
For the quickest
response, please visit
and
click on .
Quoizel.com
Contact Us
912575KIT
B
C
D
PART
DESCRIPTION
QUANTITY
Fixture Body
3pcs
2pcs
Wire Connector
Outlet Box Screw
C
D
E
1pc
Green Ground Screw
()Pre-assembled to Crossbar
1pc
Stock Part#
A
E
A Crossbar Assembly
(Pre-assembled to fixture body)
1pc
B
N/A
Glass
(Pre-assembled to fixture body)
F
1pc
G12577SH
F
Model#
LWS3200C
Item# 0759427
04.28.2018
Español p. 9
Français p. 5

Summary of content (12 pages)