Installation Guide

1of2
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Assembly Instruction Sheet #IS-MTE1509BN
For Style MTE1509BN
Pleasegoto forproductcleaningtips.Gotothe selection.
(1)A19MediumBaseBulb100WMaximumor
(1)9”LT10MediumBaseVintageBulbisrecommendedbutnotsupplied.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssembly Time:
Preparation:
ToolsRequired: Flathead screwdriver,Phillips screwdriver,pliers, wire cutters, wire strippers, electrical tape, safety glasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Package Contents
A
Crossbar Assembly
x1
B
6” Rod
x2
C
12” Rod
x2
F
D
Thank you forpurchasing a Quoizelproduct.
Need assistance withparts or assembly?Call Quoizel customerservice at 1-800-645-3184
or visit us on-line at www.quoizel.com
E
Fixture Body
x1
Shade
x1
STEP 1 - Install Bulb and Shade
A. Unscrew the screw and open
the bottom cage of the Fixture
Body (E).
B. Insert the bulb into socket and
screw snug into place.
C. Remove lock screws from the
Figure 1
2017 QuoizelInc.
ReleasedDate:2017-04-18
Ceiling
Canopy
x1
(Step 1 Continued)
socket cup first. Insert the Shade (F) into the cage and secure by
threading lock screws back onto the socket cup. Tighten lock screws
gently until they are attached to the neck of the Shade (F).
D. Carefully release the Shade (F) and close the bottom cage. Tighten
the bottom cage with previously removed screw.
STEP 2 - Install Ceiling Canopy, Rods and
Fixture Body together
A. Determine the Rods (B/C) to be assembled to
the Fixture Body (E) according to your
hanging height.
B. Pass the supply wires and ground wire
through the chosen rods (B/C) and the
B
B
D
Supply Wires
and Ground Wire
C
Ceiling Canopy (D). Thread
the Fixture Body (E), the
chosen Rods (B/C) and the
Ceiling Canopy (D) together.
Hand tighten until snug.
Suggested rods for Ceiling
height :
8’ ceiling : use (1) 6” rod and
(1) 12” rod
9’ ceiling : use (1) 6” rod and
(2) 12” rods
10’ ceiling: use (2) 6” rods and
(2) 12” rods
E
C
Figure 2
STEP 3 - Installing the Crossbar
Assembly
A. Pass the supply wires from
outlet box through the Crossbar
Assembly (A). Attach the
Crossbar Assembly (A) to the
Outlet Box with the head of the
Green Ground Screw facing you.
Secure the Crossbar Assembly
(A) with Outlet Box Screws (not
included). Tighten until snug.
Supply
Wires with
Ground Wire
Outlet Box Screws
(not included)
Outlet
Box
A
Figure 3
9”L
T10 Vintage Bulb
(recommended
but not supplied)
Lock Screw
E
F
Screw
E

Summary of content (2 pages)