Installation Sheet

1of2
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Assembly Instruction Sheet #IS-QF3412C
For Style QF3412C
Pleasegoto forproductcleaningtips.Gotothe selection.
(2)A19MediumBaseBulbs60WMaximum
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssembly Time:
Preparation:
ToolsRequired: Flathead screwdriver,Phillips screwdriver,pliers, wire cutters, wire strippers, electrical tape, safety glasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Package Contents
A
Crossbar Assembly
x1
B
Cage
x1
C
Shade
x1
D
Ceiling Canopy
x1
Thank you forpurchasing a Quoizelproduct.
Need assistance withparts or assembly?Call Quoizel customerservice at 1-800-645-3184
or visit us on-line at www.quoizel.com
2017 QuoizelInc.
ReleasedDate:2017-08-23
STEP 1 Install Crossbar Assembly-
.
A. Pass the supply wires through the Crossbar Assembly (A). Attach
the Crossbar Assembly (A) to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included). Tighten until snug
Supply Wires with
Ground Wire
Outlet Box Screws
(not included)
Outlet Box
Figure 1
A
STEP 2 Test Fitting Ceiling Canopy to Crossbar Assembly-
A. Remove mounting balls from the Crossbar Assembly (A). Fit the
Mounting Screw
Mounting Ball
A
B
Figure 2
Hex Nut and
Lock Washer
(Step 2 Continued)
Ceiling Canopy to the
Ceiling Canopy
ceiling
(B) Crossbar Assembly (A) and secure with
mounting balls. Note: The (B) should be snug
against the and the mounting balls. If not, adjust the length of
the nipple on the Crossbar Assembly (A) by unscrewing the
preassembled hex nut and lock washer and then screwing the
mounting screws in or out of the crossbar until the correct length is
achieved. Once the Ceiling Canopy (B) is secure, remove the
mounting ball and Ceiling Canopy (B) and proceed to Step 3.
STEP 3 - Wire Connections
A. Use standard wire connectors (not included) to make all wire
connections. Twist connectors until wires are tightly joined together.
Wrap each connection with approved electrical tape and carefully
stuff all the connected wires into the Outlet Box.
Figure 3
White wire
from outlet box
White wire
from fixture
Black wire from
outlet box (or Red)
Black wire
from fixture
Bare, or Green
Ground wire
from outlet box
Ground wire
from fixture
Bare, or Green
Ground wire
from outlet box
OR
Ground wire
from fixture
Green Ground Screw
on the Crossbar
STEP 4 Install the Ceiling Canopy-
A. Carefully tuck all wires into the outlet box and position the Ceiling
Canopy (B) over the outlet box. Align the holes in the Ceiling Canopy
(B) with the mounting screws, then attach the Ceiling Canopy (B)
using the previously removed mounting balls. Hand tighten until
snug.
Mounting Screw
Mounting Ball
A
B
Figure 4

Summary of content (2 pages)