Installation Sheet

1of3
2019 QuoizelInc.
visit us on-line at www.quoizel.com
ReleasedDate:2019-09-16
For Styles QF5222AN, QF5222FR and QF5222WS
Installation Guide
Crossbar Assembly
x1
A
Package Contents
PARTS BAG
Fixture
Body
x1
D
Shade
x1
E
Stem
Assembly
x1
F
Socket Assembly
x1
G
Socket Assembly,
Stem Assembly &
Fixture Body Wiring
Shade
Table of
Contents
STEP 1 STEP 3 STEP 5
Fixture Body
STEP 4
Preparation: Identify and inspect all parts
before beginning the installation.
Missing or damaged parts? Contact your
original place of purchase.
LightSourceToolsRequired
2BULBSREQUIRED
BULBSNOTINCLUDED
Warnings and Cautions
Turn off the electricity at the circuit breaker
before installation. Consult a licensed
electrician if in doubt about installation.
Turn off power to the fixture and allow the
bulbs to cool before replacing.
Crossbar Assembly
STEP 2
Bulbs
STEP 6
Outlet Box Screw
x2
B
Wire Connector
x3
C
BULB BASE TYPE
Medium (E26)
BULB SHAPE
TYPE A
100W
MAX

Summary of content (3 pages)