User guide
Table Of Contents

RLP I&M MANUAL/EN/07.20.10 
6/18
This document and the information contained herein, is the exclusive property of R&M MATERIALS HANDLING, INC. and represents a non-public, confidential and proprietary trade 
secret  that  may not  be reproduced, disclosed to  third parties,  altered or otherwise employed in  any manner whatsoever without the express written  consent of  R&M MATERIALS 
HANDLING, INC. . Copyright © (2010) R&M MATERIALS HANDLING, INC. All rights reserved. 
1.4  Operating Practices 
In addition to the Safe Operating Practices – Dos and Don’ts, it recommended that the following operating 
practices  (taken  in  part  from  American  National  Standards  ASME  HST-3M)  be  adhered  to  when  using  a 
lever-operated puller. 
•  The  supporting  structure  or  anchoring means  shall  have  a  load rating  at  least  equal  to  that  of  the 
hoist. 
•  The  operator  shall  familiarize  himself  with  the  operation  of  the  equipment  and  its  proper  care.  If 
adjustments  are  necessary  or  damage  is  known,  the  unit  must  be  removed  from  service  and  not 
used until corrections are made. 
•  Hoists shall be used only in locations that will allow the operator to be free of the load. 
•  The operator shall make sure that all people in the area are clear of the load. 
•  The  operator  shall  not  engage  in  any  activity,  which  will  divert  his  attention  while  operating  the 
equipment. 
•  The operator shall not attempt to use free-chaining feature with any load on the unit. A load shall not 
be applied with the control function in the neutral position. 
•  The unit shall always be operated by hand power only and never operated with an extension on the 
lever. 
1.5  Handling the Load 
•  The rated load shall not be exceeded. 
•  The load chain shall not be wrapped around the load. 
•  The  load  shall  be  attached  to  the  load  hook  or  attached  by  means  of  slings  or  other  approved 
apparatus. 
•  Slings or other approved apparatus shall be seated properly in the saddle of the hook. 
•  Hook safety latch shall be closed before operating the unit. 
•  Hooks shall not be tip loaded 
•  Before lifting or pulling, the operator must be certain that 
1.  Load chain is not twisted, kinked and is properly seated in the load wheel. 
2.  Load is not caught on any obstructions, 
3.  Clearance is available to avoid personal injury or property damage. 
•  Unit  shall  not  be  operated  until  the  load  block;  chain  and  unit  body  are directly  inline with  the 
direction of loading to avoid side pull. 
•  Do not leave a loaded lever puller unattended at any time. 
2  PACKAGING 
The various models are delivered assembled and packed in cardboard boxes. 










