User's Manual
TEX1002LCD
9 / 54
User Manual
Rev. 2.1 - 26/06/19
  5.  Installation and use
This section provides a step-by-step description of equipment installation and 
configuration procedure.  Follow these procedures closely upon first power-on 
and each time any change is made to general configuration, such as when a new 
transmission station is added or the equipment is replaced.
  IMPORTANT:  always remove the mains voltage before carrying out any type of 
installation and/or maintenance. It is essential to interrupt the power supply to 
avoid the risk of electric shock which could cause material damage to people or 
property, serious injuries and even death. 
The equipment must only be installed by qualified personnel.       
With qualified personnel, it identifies personnel who respond to all directives, laws 
and regulations concerning safety, applicable to installation and operation of this 
device.
The choice of qualified,  and appropriately  trained, personnel is always under 
responsibility of the company in which this personnel is a part, because is the 
company in question that determines whether a worker is suitable for a particular 
job, in order to protect its safety by respecting the applicable law on workplace 
safety matter.
These companies must provide appropriate training to their staff on  electrical 
devices, and make sure that they familiarize themselves with the contents of this 
manual.
The respect of the safety instructions set, forth in this manual or in the specified 
legislation, does not exempt you from compliance with other specific regulations 
regarding  installation,  place,  Country  or  other  circumstances  affecting  the 
equipment.
  IMPORTANT: there is a possible danger due electric shock, therefore it is mandatory 
to comply with the applicable law on safety with regard to electrical aspects.
Once the desired configuration has been set up, no more settings are required 
for  normal operation; at each  power-up  (even after an accidental  shutdown), 
the  equipment  defaults to  the parameters set during  the initial  configuration 
procedure.
The topics covered in this section are discussed at greater length in the next 
sections, with detailed descriptions of all hardware and firmware features and 
capabilities. Please see the relevant sections for additional detail.
  IMPORTANT:  When configuring and testing the transmitter in which the equipment 
is integrated, be sure to have the Final Test Table supplied with the equipment ready 
at hand throughout the whole procedure; the Final Test Table lists all operating 
parameters as set and tested at the factory..










