User's Manual

8 / 36
User Manual
Rev. 2.0 - 26/06/19
TEX100LCD/S
ELETTRONICA
5. Installation and use
This section provides a step-by-step description of equipment installation and
configuration procedure. Follow these procedures closely upon first power-on
and each time any change is made to general configuration, such as when a new
transmission station is added or the equipment is replaced.
IMPORTANT: always remove the mains voltage before carrying out any type of
installation and/or maintenance. It is essential to interrupt the power supply to
avoid the risk of electric shock which could cause material damage to people or
property, serious injuries and even death.
The equipment must only be installed by qualified personnel.
With qualified personnel, it identifies personnel who respond to all directives, laws
and regulations concerning safety, applicable to installation and operation of this
device.
The choice of qualified, and appropriately trained, personnel is always under
responsibility of the company in which this personnel is a part, because is the
company in question that determines whether a worker is suitable for a particular
job, in order to protect its safety by respecting the applicable law on workplace
safety matter.
These companies must provide appropriate training to their staff on electrical
devices, and make sure that they familiarize themselves with the contents of this
manual.
The respect of the safety instructions set, forth in this manual or in the specified
legislation, does not exempt you from compliance with other specific regulations
regarding installation, place, Country or other circumstances affecting the
equipment.
IMPORTANT: there is a possible danger due electric shock, therefore it is mandatory
to comply with the applicable law on safety with regard to electrical aspects.
Once the desired configuration has been set up, no more settings are required
for normal operation; at each power-up (even after an accidental shutdown),
the equipment defaults to the parameters set during the initial configuration
procedure.
The topics covered in this section are discussed at greater length in the next
sections, with detailed descriptions of all hardware and firmware features and
capabilities. Please see the relevant sections for additional detail.
IMPORTANT: When configuring and testing the transmitter in which the equipment
is integrated, be sure to have the Final Test Table supplied with the equipment ready
at hand throughout the whole procedure; the Final Test Table lists all operating
parameters as set and tested at the factory.