Instructions

EN
46
What to do if... ?
i
...The set line is not available locally and the SET button on the tubular
motor is not accessible, however, the factory settings are to be loaded.
Solution
In order to carry out this configuration, it is necessary to separately connect the two
control lines for up () and down () to phase (L).
Either use an external button with two switching contacts or the commercially available
cord circuit set device (20).
Always have the connection work carried out by a specialist
electrician and observe the safety information relating to the electri-
cal connection on page 37.
NOTE
Further information can be obtained from our Website at www.rademacher.de.
2.
1.
Press the down () button and wait until the roller
shutters have travelled to the lower end point.
IMPORTANT
Keep holding down the down () button even after
the lower end point has been reached.
Once the electrical connection is made, determine
the direction of rotation by means of briefly press-
ing the button.
3.
Additionally, briefly
press the up () button
5 times for 0.5 seconds
each time and on the
sixth press, hold the
button down.
4.
After a short time, the tubular motor acknowledges
by briefly running up and down.
The factory settings are now loaded.
Now release both buttons.5.
Re-adjust the end points if necessary, see page 41.
6.
7.
Switch off the mains power supply and reconfigure
the original connection in accordance with connection
diagram l on page 38.
1 x 0,5 s 1.
Hold down.6.
.
.
.
1 x 0,5 s 2.
1 x 0,5 s 3.
1 x 0,5 s 4.
1 x 0,5 s 5.
Brief description for loading the factory settings.