- Introduction
- System Description
- Pre-Installation
- Receipt of Equipment
- Site Planning
- Main Rack and Supporting Hardware
- Remote ACUs
- RFUs
- RadioBlades
- RAPs
- URU
- Interconnecting Cabling
- Main Rack Configuration
- RF Planning
- Site Survey
- Alarm Configuration
- Tools Required
- Installation
- Equipment Commissioning
- iDEN Interface
- Power Plant
- RadioFrame System
- Coverage Validation
- Site Acceptance Guidelines
- RadioFrame System Functionality Test
- RadioFrame System iDEN Functionality Test
- Interconnect & Dispatch Setup & Voice Quality
- Packet Data Service Connection and Latency
- Short Message Service
- Handover and Cell Reselection
- Interconnect Connection Stability and SQE Performance
- Dispatch Connection Stability
- Idle SQE Testing and Validation
- System Self-Recovery Test
- Packet Data Stability and Throughput
- Validation of ‘Unable to Key BR’ Alarm
- Rectifier & AC Power Alarms
- iSC-3 Functionality Test
- RadioFrame System iDEN Functionality Test
- Connecting the RFS to the Customer LAN
- Operations and Maintenance
- Appendixes
RadioFrame System
Equipment Commissioning
RFN_3.1 Beta 97
• RFS iDEN functionality test:
- iDEN 3:1 Interconnect Voice
- iDEN 6:1 Private and Group Dispatch
- iDEN Packet Data
- iDEN Short Message Service
• Rectifier & AC power alarms
• iSC-3 functionality test
Once the RFS System Functionality Testing is successfully completed, the RFS
can be connected to the Customer LAN, and system testing for the WLAN may
be completed.
5.6.1 RadioFrame System iDEN Functionality Test
Test and verification of the RadioFrame System will specifically validate the
following aspects of the above services:
• Voice quality for 3:1 Interconnect Voice
• Voice quality for 6:1 Private Group Dispatch Voice
• Call setup reliability for 3:1 Interconnect Voice
• Call setup reliability for 6:1 Private and Group Dispatch Voice
• Call stability for all of the above voice services
• Voice capacity
• Connection quality, stability, delay and perceived throughput for the Packet
Data service
• Connection setup reliability for Packet Data
• Idle SQE quality and variation
• Call up SQE quality and variation
• Short Message Service
• Handover and cell reselection
• Overall system stability (includes recovery from T1, iSC-3 and GPS outages)
• Performance will also be validated by collecting at least one week of
performance statistical data
5.6.1.1 Interconnect & Dispatch Setup & Voice Quality
Interconnect and Dispatch voice quality will be assessed by evaluating voice
links as described in Tables 1, 2, and 3. RSSI and SQE measurements will be