Installation Guide
Table Of Contents
- Title
- Contents
- Introduction
- System Description
- Pre-Installation
- Receipt of Equipment
- Site Planning
- Main Rack and Supporting Hardware
- Remote ACUs
- RFUs
- RadioBlades
- RAPs
- URU
- Interconnecting Cabling
- Main Rack Configuration
- RF Planning
- Site Survey
- Alarm Configuration
- Tools Required
- Installation
- Equipment Commissioning
- iDEN Interface
- Power Plant
- RadioFrame System
- Coverage Validation
- Site Acceptance Guidelines
- RadioFrame System Functionality Test
- RadioFrame System iDEN Functionality Test
- Interconnect & Dispatch Setup & Voice Quality
- Packet Data Service Connection and Latency
- Short Message Service
- Handover and Cell Reselection
- Interconnect Connection Stability and SQE Performance
- Dispatch Connection Stability
- Idle SQE Testing and Validation
- System Self-Recovery Test
- Packet Data Stability and Throughput
- Validation of ‘Unable to Key BR’ Alarm
- Rectifier & AC Power Alarms
- iSC-3 Functionality Test
- RadioFrame System iDEN Functionality Test
- Connecting the RFS to the Customer LAN
- Operations and Maintenance
- Appendixes
Method of Procedure
Pre-Installation
34 RFN_3.1 Beta
System Unit Front Clearance
iSC-3 (2) 12”
EAS 12”
CSU 12”
Power Plant Rectifier 12”
Battery 12”
3.3.2.3 Sides
System Unit Side Clearance
RadioFrame System NCU right side facing 2”; left side 0”
ACU right side facing 2”; left side 0”
iDEN Interface iSC-3 (1) right side facing 2” / left side 2”
iSC-3 (2) right side facing 2” / left side 2”
EAS right side facing 2” / left side 2”
CSU right side facing 2” / left side 2”
Power Plant Rectifier right side facing 2” / left side 2”
Battery right side facing 2” / left side 2”
3.3.2.4 Above
System Unit Above Clearance
RadioFrame System NCU 0”
ACU 0”
iDEN Interface iSC-3 (1) 0”
iSC-3 (2) 0”
EAS 0”
CSU 0”
Power Plant Rectifier 0”
Battery 0”
3.3.3 Weight
System Unit Weight
RadioFrame System NCU 27 lbs
ACU 27 lbs
iDEN Interface iSC-3 (1)